Model Design and Application for Excavation Face Stability in Upward Shield Tunneling

被引:0
|
作者
Wang, Xiao [1 ,2 ,3 ]
Li, Yijie [1 ,2 ,3 ]
Wei, Gang [1 ,2 ,3 ,4 ]
Wei, Xinjiang [1 ,2 ,3 ]
Yan, Zihai [5 ,6 ]
Yan, Jiajia [5 ,6 ]
Li, Baojian [3 ,5 ]
机构
[1] Hangzhou City Univ, Dept Civil Engn, Hangzhou 310015, Peoples R China
[2] Key Lab Safe Construction & Intelligent Maintenanc, Hangzhou 310015, Peoples R China
[3] Zhejiang Engn Res Ctr Intelligent Urban Infrastruc, Hangzhou 310015, Peoples R China
[4] Zhejiang Univ, Coll Civil Engn & Architecture, Hangzhou 310058, Peoples R China
[5] Power China Huadong Engn Corp, Hangzhou 311122, Peoples R China
[6] Power China Smart Rail Transit Engn Res Ctr, Hangzhou 311122, Peoples R China
基金
中国国家自然科学基金;
关键词
upward shield method; excavation face stability; model test; tunnel; soil arching effect; SEEPAGE FORCES; FAILURE; CENTRIFUGE; PRESSURE;
D O I
10.3390/buildings14082514
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The emerging upward shield method (USM) for constructing vertical shafts has been used in various projects, including the Midosuji utility tunnel in Japan. A scaled-down model testing system, featuring a geometric similarity ratio of 1:30, was developed specifically for studying the USM. This system incorporates sand inflow control, propulsion control, data acquisition, and water level control. It facilitates detailed observation and recording of parameters such as vertical displacement of surface soil layers, support force at the excavation face, and earth pressure within the model box. Consequently, it enables investigation into the excavation face instability process, modes, and the formation and evolution of the soil arch zone above the excavation face during upward shield tunneling. Additionally, through the application of particle image velocimetry (PIV) technology and GeoPIV-RG software v1.1, quantitative analysis of soil displacement fields during excavation face instability is conducted, capturing microscopic displacements and deformations of soil planes. This approach more accurately elucidates the accuracy of understanding the dynamic response of soil. Pre-test research using the model testing system explores the variation patterns of excavation face load displacement, vertical earth pressure within the failure zone, surface displacement, and internal soil displacement during the instability process. Analysis reveals that excavation face load variation typically progresses through three stages: rapid growth, slow growth, and descent. Moreover, vertical earth pressure shifts upward in tandem with excavation face displacement, while overall surface displacement initially shows slight settlement followed by accelerated uplift.
引用
收藏
页数:23
相关论文
共 50 条
  • [31] Stability Analysis of Shield Excavation Surface with Curved Body Model
    Chun-lin Li
    KSCE Journal of Civil Engineering, 2022, 26 : 5342 - 5352
  • [32] Optimization Design for Support Pressure of Shield Tunnel Face to Predict the Ground Disturbance Induced by Shield Excavation
    Tu, Cheng
    Li, Chengchao
    Jiang, Pengming
    INTERNATIONAL JOURNAL OF GEOMECHANICS, 2024, 24 (12)
  • [33] A case study on the stability of the shield excavation face in full-section coarse sand
    Cheng, Cheng
    Zhao, Wen
    Qi, Diyang
    Han, Jianyong
    Jia, Pengjiao
    Chen, Yang
    Bai, Qian
    SUSTAINABLE CITIES AND SOCIETY, 2019, 47
  • [34] Study on Stability of Shield Tunnel Excavation Face in Soil-Rock Composite Stratum
    Sui, Hongtao
    Ma, Chao
    Dai, Chunquan
    Yang, Tingzhi
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2021, 2021
  • [35] Study on Stability of shield tunnel excavation face with soft upper and hard lower strata
    Wang, Qian
    Li, Qiang
    Zhang, Yongyuan
    Li, Jiaxing
    2022 8TH INTERNATIONAL CONFERENCE ON HYDRAULIC AND CIVIL ENGINEERING: DEEP SPACE INTELLIGENT DEVELOPMENT AND UTILIZATION FORUM, ICHCE, 2022, : 333 - 337
  • [36] Analysis of Face Stability during Excavation of Double-O-Tube Shield Tunnel
    Yang, Yuyou
    Zhou, Qinghong
    Li, Hongan
    Huang, Xuegang
    Tu, Xiaoming
    SCIENTIFIC WORLD JOURNAL, 2013,
  • [37] Study on the disturbance and excavation face failure feature of granular mixtures stratum due to EPB shield tunneling
    Hu X.
    Yan Q.
    He C.
    Yang X.
    He, Chuan (chuanhe21@163.com), 1618, Academia Sinica (35): : 1618 - 1627
  • [38] Face stability analysis of mechanized shield tunneling: An objective systems approach to the problem
    Naghadehi, Masoud Zare
    Thewes, Markus
    Lavasan, Arash Alimardani
    ENGINEERING GEOLOGY, 2019, 262
  • [39] PFC-FLAC coupling analysis of face stability for EPB shield tunneling
    Fu J.
    Xie J.
    Fang Y.
    Yang J.
    Huazhong Keji Daxue Xuebao (Ziran Kexue Ban)/Journal of Huazhong University of Science and Technology (Natural Science Edition), 2019, 47 (05): : 116 - 121
  • [40] Parameter analysis of excavation face stability of shield tunnel under high water pressure seepage
    Cheng, Xuansheng
    Zhang, Shanglong
    Zhou, Xinhai
    Xia, Peiyan
    PHYSICS AND CHEMISTRY OF THE EARTH, 2022, 128