Model Design and Application for Excavation Face Stability in Upward Shield Tunneling

被引:0
|
作者
Wang, Xiao [1 ,2 ,3 ]
Li, Yijie [1 ,2 ,3 ]
Wei, Gang [1 ,2 ,3 ,4 ]
Wei, Xinjiang [1 ,2 ,3 ]
Yan, Zihai [5 ,6 ]
Yan, Jiajia [5 ,6 ]
Li, Baojian [3 ,5 ]
机构
[1] Hangzhou City Univ, Dept Civil Engn, Hangzhou 310015, Peoples R China
[2] Key Lab Safe Construction & Intelligent Maintenanc, Hangzhou 310015, Peoples R China
[3] Zhejiang Engn Res Ctr Intelligent Urban Infrastruc, Hangzhou 310015, Peoples R China
[4] Zhejiang Univ, Coll Civil Engn & Architecture, Hangzhou 310058, Peoples R China
[5] Power China Huadong Engn Corp, Hangzhou 311122, Peoples R China
[6] Power China Smart Rail Transit Engn Res Ctr, Hangzhou 311122, Peoples R China
基金
中国国家自然科学基金;
关键词
upward shield method; excavation face stability; model test; tunnel; soil arching effect; SEEPAGE FORCES; FAILURE; CENTRIFUGE; PRESSURE;
D O I
10.3390/buildings14082514
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The emerging upward shield method (USM) for constructing vertical shafts has been used in various projects, including the Midosuji utility tunnel in Japan. A scaled-down model testing system, featuring a geometric similarity ratio of 1:30, was developed specifically for studying the USM. This system incorporates sand inflow control, propulsion control, data acquisition, and water level control. It facilitates detailed observation and recording of parameters such as vertical displacement of surface soil layers, support force at the excavation face, and earth pressure within the model box. Consequently, it enables investigation into the excavation face instability process, modes, and the formation and evolution of the soil arch zone above the excavation face during upward shield tunneling. Additionally, through the application of particle image velocimetry (PIV) technology and GeoPIV-RG software v1.1, quantitative analysis of soil displacement fields during excavation face instability is conducted, capturing microscopic displacements and deformations of soil planes. This approach more accurately elucidates the accuracy of understanding the dynamic response of soil. Pre-test research using the model testing system explores the variation patterns of excavation face load displacement, vertical earth pressure within the failure zone, surface displacement, and internal soil displacement during the instability process. Analysis reveals that excavation face load variation typically progresses through three stages: rapid growth, slow growth, and descent. Moreover, vertical earth pressure shifts upward in tandem with excavation face displacement, while overall surface displacement initially shows slight settlement followed by accelerated uplift.
引用
收藏
页数:23
相关论文
共 50 条
  • [2] Model test of shield tunnel excavation face stability in sand
    Shen, Xiang
    Yuan, Dajun
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2015, 48 : 261 - 265
  • [3] Excavation Face Stability of Shield Tunneling Closely Under Existing Tunnels: Particle Flow Simulation
    Fei Xue
    Mengxi Zhang
    Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2020, 44 : 497 - 506
  • [4] Excavation Face Stability of Shield Tunneling Closely Under Existing Tunnels: Particle Flow Simulation
    Xue, Fei
    Zhang, Mengxi
    IRANIAN JOURNAL OF SCIENCE AND TECHNOLOGY-TRANSACTIONS OF CIVIL ENGINEERING, 2020, 44 (SUPPL 1) : 497 - 506
  • [5] On the Analysis Methods of Face Stability in Shield Tunnel Excavation
    Bin, Zhi
    2009 INTERNATIONAL CONFERENCE ON INFORMATION MANAGEMENT, INNOVATION MANAGEMENT AND INDUSTRIAL ENGINEERING, VOL 1, PROCEEDINGS, 2009, : 433 - 436
  • [6] TUNNEL FACE STABILITY IN SLURRY SHIELD TUNNELING
    BALTHAUS, H
    PROCEEDINGS OF THE TWELFTH INTERNATIONAL CONFERENCE ON SOIL MECHANICS AND FOUNDATION ENGINEERING, VOL 2, 1989, : 775 - 778
  • [7] Analysis and prediction of the river levee settlement derived from shield tunneling considering the excavation face stability
    Li, Xin
    Xue, Yiguo
    Kong, Fanmeng
    Li, Zhiqiang
    Li, Guangkun
    ACTA GEOTECHNICA, 2024, 19 (05) : 3161 - 3184
  • [8] Numerical investigation and prediction of the excavation face stability for river-crossing shield tunneling: An intelligent prediction model for limit support pressure
    Li, Xin
    Xue, Yiguo
    Li, Zhiqiang
    Kong, Fanmeng
    Li, Guangkun
    Zhou, Binghua
    COMPUTERS AND GEOTECHNICS, 2023, 160
  • [9] Calculation model of shield tunneling stability based on real face failure modes
    Hu, X.-Y. (christiehxy@163.com), 2013, Shanghai Jiaotong University (47):
  • [10] Comparison analysis for computing earth pressure acted on excavation face in shield tunneling
    Shangguan, Zi-Chang
    Li, Shou-Ju
    Sun, Wei
    Luan, Mao-Tian
    Kang, Chen-Gang
    Harbin Gongye Daxue Xuebao/Journal of Harbin Institute of Technology, 2011, 43 (SUPPL. 1): : 111 - 114