A qualitative investigation of factors influencing unsafe work behaviors on construction projects

被引:23
|
作者
Asilian-Mahabadi, Hassan [1 ]
Khosravi, Yahya [2 ]
Hassanzadeh-Rangi, Narmin [3 ]
Hajizadeh, Ebrahim [4 ]
Behzadan, Amir H. [5 ]
机构
[1] Tarbiat Modares Univ, Fac Med Sci, Dept Occupat Hlth Engn, Tehran, Iran
[2] Alborz Univ Med Sci, Sch Hlth, Dept Occupat Hlth & Safety Engn, Karaj, Iran
[3] Shahid Beheshti Univ Med Sci, Dept Occupat Hlth Engn, Student Res Comm, Tehran, Iran
[4] Tarbiat Modares Univ, Fac Med Sci, Dept Biostat, Tehran, Iran
[5] Texas A&M Univ, Dept Construct Sci, College Stn, TX USA
关键词
Behavior safety; qualitative research; fishbone diagram; workplace; SAFETY PERFORMANCE; CLIMATE; INDUSTRY; CULTURE; MODEL; SUPERVISORS; STRATEGIES; ACCIDENTS; RISK;
D O I
10.3233/WOR-182799
中图分类号
R1 [预防医学、卫生学];
学科分类号
1004 ; 120402 ;
摘要
BACKGROUND: Unsafe behavior is an important component in the chain of accident occurrences, and thus plays a key role in the accident prevention programs in construction sites. OBJECTIVE: The aim of this qualitative research is to study the perception of frontline workers, supervisors, and managers about the preconditions of and contributing factors to unsafe behaviors in civil engineering projects. METHODS: Field observation, in-depth interview, and focus group discussion are conducted with 113 informants from various mega projects during a 2-year time period. Fishbone diagram is applied to describe a conceptual model. RESULTS: The results point to fourteen themes within four categories of the conceptual model - general management, organizational factors, safety supervision and management, and individual characteristics. CONCLUSIONS: General management and organizational culture were introduced as important preconditions and contributing factors resulting in human error and unsafe behavior in the construction sites. The fishbone diagram reveals the sequence and interaction of preconditions and contributing factors. The key contributing factors and their influences on unsafe behaviors are discussed along with recommendations for future directions.
引用
收藏
页码:281 / 293
页数:13
相关论文
共 50 条
  • [21] An exploration into cost-influencing factors on construction projects
    Cheng, Ying-Mei
    INTERNATIONAL JOURNAL OF PROJECT MANAGEMENT, 2014, 32 (05) : 850 - 860
  • [22] Factors affecting unsafe behavior in construction projects: development and validation of a new questionnaire
    Asilian-Mahabadi, Hassan
    Khosravi, Yahya
    Hassanzadeh-Rangi, Narmin
    Hajizadeh, Ebrahim
    Behzadan, Amir H.
    INTERNATIONAL JOURNAL OF OCCUPATIONAL SAFETY AND ERGONOMICS, 2020, 26 (02) : 219 - 226
  • [23] A qualitative study of factors influencing adolescent smoking behaviors
    Haryati, Wiwin
    Sahar, Junaiti
    Rekawati, Etty
    Besral
    ENFERMERIA CLINICA, 2021, 31 (S 4): : 5593 - 5596
  • [24] Economic and Time Risk Factors Influencing the Construction Projects: A Case Study of Lebanese Construction Projects
    Ahmad, Omar
    Nouban, Fatemeh
    JORDAN JOURNAL OF CIVIL ENGINEERING, 2023, 17 (03) : 399 - 407
  • [25] Factors influencing the level of accuracy and compromise in overhead estimation for construction projects in India: an exploratory investigation
    Singla, Harish Kumar
    Sridharan, Srividhya
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2022, 29 (10) : 4040 - 4060
  • [26] Study on Influencing Factors of Construction Workers' Unsafe Behavior Based on Text Mining
    Li, Ping
    He, Youshi
    Li, Zhengguang
    FRONTIERS IN PSYCHOLOGY, 2022, 13
  • [27] Factors influencing adoption of construction technologies in Vietnam's residential construction projects
    Momade, Mohammed Hamza
    Durdyev, Serdar
    Van Tam, Nguyen
    Shahid, Shamsuddin
    Mbachu, Jasper
    Momade, Yusra
    INTERNATIONAL JOURNAL OF BUILDING PATHOLOGY AND ADAPTATION, 2022, 42 (05) : 1002 - 1018
  • [28] Factors Influencing Transaction Costs in Construction Projects: A Critical Review
    Jin, Xiao-Hua
    Zhang, Guomin
    Ke, Yongjian
    Xia, Bo
    PROCEEDINGS OF THE 20TH INTERNATIONAL SYMPOSIUM ON ADVANCEMENT OF CONSTRUCTION MANAGEMENT AND REAL ESTATE, 2017, : 949 - 958
  • [29] Factors influencing Time and Cost Overruns on Freeform Construction Projects
    Kavuma, Andrew
    Ock, Jongho
    Jang, Hyounseung
    KSCE JOURNAL OF CIVIL ENGINEERING, 2019, 23 (04) : 1442 - 1450
  • [30] Factors influencing the construction time of civil engineering projects in Malaysia
    Othman, Ahmad
    Torrance, Johan
    Hamid, Munshi
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2006, 13 (05) : 481 - +