Optimizing Bridge Rehabilitation: A Life Cycle Assessment and Cost Analysis of Conventional and UHPC Overlays

被引:1
|
作者
Malik, Manisha [1 ]
Amor, Ben [1 ]
机构
[1] Univ Sherbrooke, Civil & Bldg Engn Dept, Interdisciplinary Res Lab Sustainable Engn & Ecod, Sherbrooke, PQ J1K 2R1, Canada
关键词
Bridge Rehabilitation; Deck Overlay; UHPC; LCA; LCC;
D O I
10.1007/978-3-031-53389-1_87
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Bridge decks often face common issues such as concrete cracking, spalling, and deterioration. As a proactive approach to extend the bridge's service life, necessary measures must be implemented on a preventive, cyclic, or condition-driven basis. Selecting the most suitable materials for rehabilitating bridge decks is a pressing concern in extending their lifespan, underscoring the need to assess the economic and environmental performance of various overlay options. Ultra-high-performance concrete (UHPC) is one of the innovative technologies for the prevention and repair of bridge infrastructure by the USA Federal Highway Administration. UHPC requires less maintenance than traditional materials due to its very high strength and low permeability to the aggressive environment, despite the higher investment costs that may limit its deployment. It further offers enhanced performance and improved life cycle cost over conventional methods. The implementation of preventive measures could reduce the frequency of condition-driven repairs and corresponding expenditure, leading to considerably lower carbon emissions. This study performs an integrated Life Cycle Assessment (LCA) and Life Cycle Costing (LCC) to generate a parameterized model for the preventive maintenance of bridge deck rehabilitation, considering the lifespan of the bridge as the functional unit. Different bridge deck overlay formulations are compared with conventional concrete rehabilitation. An eco-efficiency analysis was conducted to assess the performance of alternative scenarios. It was observed that despite the high initial construction cost, UHPC does not require frequent maintenance, thus proving economically and environmentally viable. The study provides a methodology to have an optimal solution considering cost and environmental impacts without prioritization or subjective weighting.
引用
收藏
页码:971 / 984
页数:14
相关论文
共 50 条
  • [41] Inclusion of environmental impacts in life-cycle cost analysis of bridge structures
    Wang, Zhujun
    Yang, David Y.
    Frangopol, Dan M.
    Jin, Weiliang
    SUSTAINABLE AND RESILIENT INFRASTRUCTURE, 2020, 5 (04) : 252 - 267
  • [42] Deterioration Models for Life-Cycle Cost Analysis of Bridge Decks in Nebraska
    Hatami, Afshin
    Morcous, George
    TRANSPORTATION RESEARCH RECORD, 2012, (2313) : 3 - 11
  • [43] Study on environmental impacts cost analysis model of a bridge in its life cycle
    Liu, Muyu
    Chen, Fangfang
    Tumu Gongcheng Xuebao/China Civil Engineering Journal, 2010, 43 (SUPPL. 2): : 373 - 378
  • [44] Enhancing life cycle cost analysis with a novel cost classification framework for pavement rehabilitation projects
    Abdelaty, Ahmed
    Jeong, Hyungseok David
    Dannen, Bryan
    Todey, Francis
    CONSTRUCTION MANAGEMENT AND ECONOMICS, 2016, 34 (10) : 724 - 736
  • [45] Optimizing the Life-Cycle Cost of Human Capital
    Cunic, Bradley K.
    POWER, 2009, 153 (09) : 64 - 66
  • [46] Optimizing Test Confidence Based on Life Cycle Cost
    Bindel, Scott R.
    59TH ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM (RAMS), 2013,
  • [47] Optimizing the procurement under life cycle cost aspects
    Stocker, E.
    Koch, D.
    LIFE-CYCLE OF ENGINEERING SYSTEMS: EMPHASIS ON SUSTAINABLE CIVIL INFRASTRUCTURE, 2017, : 2404 - 2409
  • [48] Life-Cycle Cost and Life-Cycle Assessment Analysis at the Design Stage of a Fiber-Reinforced Polymer-Reinforced Concrete Bridge in Florida
    Cadenazzi, Thomas
    Dotelli, Giovanni
    Rossini, Marco
    Nolan, Steven
    Nanni, Antonio
    ADVANCES IN CIVIL ENGINEERING MATERIALS, 2019, 8 (02): : 128 - 151
  • [49] Bridge life cycle assessment with data uncertainty
    Yu-Rong Zhang
    Wen-Jie Wu
    Yuan-Feng Wang
    The International Journal of Life Cycle Assessment, 2016, 21 : 569 - 576
  • [50] Bridge life cycle assessment with data uncertainty
    Zhang, Yu-Rong
    Wu, Wen-Jie
    Wang, Yuan-Feng
    INTERNATIONAL JOURNAL OF LIFE CYCLE ASSESSMENT, 2016, 21 (04): : 569 - 576