Stable partial nitrification was achieved for nitrogen removal from municipal wastewater by gel immobilization: A pilot-scale study

被引:0
|
作者
Hu, Xin [1 ]
Yang, Hong [1 ]
Fang, Xiaoyue [2 ]
Liu, Xuyan [3 ]
Wang, Jiawei [4 ]
Wang, Xiaotong [5 ]
Bai, Yongsheng [6 ]
Su, Bojun [6 ]
机构
[1] Beijing Univ Technol, Fac Architecture Civil & Transportat Engn, Key Lab Beijing Water Qual Sci & Water Environm Re, Beijing 100124, Peoples R China
[2] Beijing Gen Municipal Engn Design & Res Inst Co Lt, Beijing 100044, Peoples R China
[3] Hebei GEO Univ, Shijiazhuang 050031, Peoples R China
[4] Hebei Univ Architecture, Hebei Key Lab Water Qual Engn & Comprehens Utiliza, Zhangjiakou 075000, Peoples R China
[5] Tianjin Univ Technol, Sch Environm Sci & Safety Engn, Tianjin 300384, Peoples R China
[6] Beijing Drainage Grp Co Ltd, Beijing 100044, Peoples R China
来源
关键词
Gel immobilization; Partial nitrification; Deep nitrogen removal; Autonomous enrichment; Sludge yield; MICROBIAL COMMUNITY; MEMBRANE BIOREACTOR; PARTIAL-NITRITATION; BIOFILM REACTOR; PERFORMANCE; OPERATION; AERATION; BACTERIA; GROWTH; SRT;
D O I
10.1016/j.jes.2024.04.020
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
As an energy and carbon saving process for nitrogen removal from wastewater, the partial nitrification and denitrification process (PN/D) has been extensively researched. However, achieving stable PN in municipal wastewater has always been challenging. In this study, a gel immobilized PN/D nitrogen removal process (GI-PN/D) was established. A 94d pilot -scale experiment was conducted using real municipal wastewater with an ammonia concentration of 43.5 +/- 5.3 mg N/L at a temperature range of 11.3-28.7 degrees C. The nitrogen removal performance and associated pathways, shifts in the microbial community as well as sludge yield were investigated. The results were as follows: the effluent TN and COD were 0.6 +/- 0.4 mg/L and 31.1 +/- 3.8 mg/L respectively, and the NAR exceeding 95 %. GI-PN/D achieved deep nitrogen removal of municipal wastewater through stable PN without taking any other measures. The primary pathways for nitrogen removal were identified as denitrification, simultaneous nitrification-denitrification, and aerobic denitrification. High -throughput sequencing analysis revealed that the immobilized fillers facilitated the autonomous enrichment of functional bacteria in each reactor, effectively promoting the dominance and stability of the microbial communities. In addition, GI-PN/D had the characteristic of low sludge yield, with an average sludge yield of 0.029 kg SS/kg COD. This study provides an effective technical for nitrogen removal from municipal wastewater through PN. (c) 2024 The Research Center for Eco-Environmental Sciences, Chinese Academy of Sciences. Published by Elsevier B.V.
引用
收藏
页码:529 / 539
页数:11
相关论文
共 50 条
  • [21] Removal of heat stable salts from N-methyldiethanolamine wastewater using electrodialysis: a pilot-scale study
    Chen, Fuqiang
    Chi, Yongzhi
    Zhang, Mengyi
    Yang, Kun
    Fu, Cuilian
    DESALINATION AND WATER TREATMENT, 2020, 196 : 48 - 57
  • [22] Cyanide removal from wastewater using gas membranes: Pilot-scale study
    Shen, ZS
    Han, BB
    Wickramasinghe, R
    WATER ENVIRONMENT RESEARCH, 2004, 76 (01) : 15 - 22
  • [23] Nitrification and denitrification using biofilters packed with sulfur and limestone at a pilot-scale municipal wastewater treatment plant
    Ahmed, Zubair
    Kim, Sung-Min
    Kim, In S.
    Bum, Min-Soo
    Chae, Kyu-Jung
    Joo, Jin-Ho
    Ok, Yong Sik
    Oh, Sang-Eun
    ENVIRONMENTAL TECHNOLOGY, 2012, 33 (11) : 1271 - 1278
  • [24] Achieving stable advanced nitrogen removal from mainstream municipal wastewater using integrated strategies in partial nitrification anammox (PNA) granular hybrid system
    Feng, Dianbao
    He, Yuxiong
    Lu, Wenkang
    Bu, Yinan
    Wei, Yan
    Ma, Bin
    CHEMICAL ENGINEERING JOURNAL, 2024, 486
  • [25] A pilot-scale study on nitrogen removal from dry-spun acrylic fiber wastewater using anammox process
    Yang, F. (polan05771@hotmail.com), 1600, Elsevier B.V., Netherlands (222):
  • [26] A pilot-scale study on nitrogen removal from dry-spun acrylic fiber wastewater using anammox process
    An, Peng
    Xu, Xiaochen
    Yang, Fenglin
    Liu, Lifen
    Liu, Sitong
    CHEMICAL ENGINEERING JOURNAL, 2013, 222 : 32 - 40
  • [27] Hydraulic retention time optimization achieved unexpectedly high nitrogen removal rate in pilot-scale anaerobic/aerobic/anoxic system for low-strength municipal wastewater treatment
    Wu, You
    Peng, Zhihao
    Wang, Hanbin
    Zhang, Liang
    Zeng, Wei
    Cao, Yu-An
    Liao, Jiajun
    Liang, Zihao
    Liang, Qifeng
    Peng, Yongzhen
    BIORESOURCE TECHNOLOGY, 2024, 393
  • [28] Treatment of semiconductor wastewater using single-stage partial nitrification and anammox in a pilot-scale reactor
    Liang, Ying-Chang
    Daverey, Achlesh
    Huang, Yu-Tzu
    Sung, Shihwu
    Lin, Jih-Gaw
    JOURNAL OF THE TAIWAN INSTITUTE OF CHEMICAL ENGINEERS, 2016, 63 : 236 - 242
  • [29] Hydraulic retention time optimization achieved unexpectedly high nitrogen removal rate in pilot-scale anaerobic/aerobic/anoxic system for low-strength municipal wastewater treatment
    Wu, You
    Peng, Zhihao
    Wang, Hanbin
    Zhang, Liang
    Zeng, Wei
    Cao, Yu-An
    Liao, Jiajun
    Liang, Zihao
    Liang, Qifeng
    Peng, Yongzhen
    Bioresource Technology, 2024, 393
  • [30] Hyperhaline Municipal Wastewater Treatment of a Processing Zone through Pilot-Scale A/O MBR, Part II: Nitrogen and Phosphorous Removal
    Sun, Jingmei
    Wang, Xiaohui
    Li, Ruixian
    Zhu, Wen-ting
    Li, Ying
    2011 INTERNATIONAL CONFERENCE ON ENVIRONMENT SCIENCE AND BIOTECHNOLOGY (ICESB 2011), 2011, 8 : 781 - 788