An integrated determination method of optimal supporting time against TBM jamming

被引:4
|
作者
Kang, Jintao [1 ,2 ]
Xie, Huihui [1 ,3 ]
Lin, Peng [1 ,2 ]
Xu, Zhenhao [1 ,2 ]
机构
[1] Shandong Univ, Geotech & Struct Engn Res Ctr, Jinan 250061, Shandong, Peoples R China
[2] Shandong Univ, Sch Qilu Transportat, Jinan 250061, Shandong, Peoples R China
[3] Shandong Univ, Sch Civil Engn, Jinan 250061, Shandong, Peoples R China
基金
中国国家自然科学基金;
关键词
TBM tunnels; Fault zone; TBM jamming; Large deformation characteristics; Numerical simulation; Optimal supporting time; ROCK MASS; TUNNEL; SYSTEM; MODEL; SIMULATION;
D O I
10.1016/j.engfailanal.2024.108355
中图分类号
TH [机械、仪表工业];
学科分类号
0802 ;
摘要
TBM (Tunnel Boring Machine) jamming and support failure occur frequently with inappropriate supporting time, particularly when TBM crosses adverse geology. Given this, an integrated determination method of optimal supporting time against TBM jamming was proposed. In this paper, the causes and failure mechanism of large deformation in the tunnel were revealed through X-ray diffraction (XRD) measurement of the rocks. The frictional resistance of TBM shield and the stress of support under different supporting time and measures were investigated by numerical simulation. It was shown that early installation of the support will lead to excessive load on the support, resulting in support failure. Contrarily, delayed installation of the support will lead to excessive tunnel deformation, inducing TBM shield jamming. The optimal supporting time was determined by comprehensively analyzing the critical deformation of TBM jamming and ultimate stress of support. The deformation of surrounding rock in the range of 31.6 mm similar to 39.9 mm was the optimal support time in this study. Installation support with an optimal supporting time can ensure the safety of TBM and support simultaneously. The range of optimal supporting time decreases continuously with the weakening of support parameters. Specifically, the support measures (bolt + steel arch, shotcrete + bolt) cannot simultaneously ensure the safety of the TBM and support. The research results can effectively guide the prevention of jamming and support design in TBM tunnels.
引用
收藏
页数:15
相关论文
共 50 条
  • [21] Optimal Jamming Strategy Against Two-State Switched System
    Zhu, Yu
    Zhang, Heng
    Li, Hongran
    Zhang, Jian
    Zhang, Dandan
    IEEE COMMUNICATIONS LETTERS, 2022, 26 (03) : 706 - 710
  • [22] Optimal Transmission Strategy for Sensors to Defend against Eavesdropping and Jamming Attacks
    Yuan, Li
    Wang, Kun
    Miyazaki, Toshiaki
    Guo, Song
    Wu, Meng
    2017 IEEE INTERNATIONAL CONFERENCE ON COMMUNICATIONS (ICC), 2017,
  • [23] ICA based anti-jamming method of frequency hopping communication against comb jamming
    Yu, Miao
    Wang, Yue-Hai
    Wang, Guo-Fu
    Jiefangjun Ligong Daxue Xuebao/Journal of PLA University of Science and Technology (Natural Science Edition), 2012, 13 (06): : 593 - 598
  • [24] An Anti-Jamming Method against Interrupted Sampling Repeater Jamming Based on Compressed Sensing
    Liu, Yingxi
    Zhang, Qun
    Liu, Zhidong
    Li, Guangming
    Xiong, Shichao
    Luo, Ying
    SENSORS, 2022, 22 (06)
  • [25] DETERMINATION OF RESIDENCE TIMES AND RESIDENCE TIME DISTRIBUTIONS BY INTEGRATED PULSE METHOD
    HOVENKAMP, SG
    INTERNATIONAL JOURNAL OF APPLIED RADIATION AND ISOTOPES, 1968, 19 (01): : 63 - +
  • [26] Determination and Analysis of the Optimal Prediction Method of GNSS System Time Offset
    Zhu, Lin
    Zhang, Huijun
    Li, Xiaohui
    Ren, Ye
    Liu, Yinhua
    2016 IEEE International Frequency Control Symposium (IFCS), 2016, : 452 - 456
  • [27] Determination of Supporting Time of Tunnels in the Xigeda Stratum Based on the Convergence-Confinement Method
    Zhong, Zuliang
    Tang, Tenglong
    Li, Yapeng
    APPLIED SCIENCES-BASEL, 2023, 13 (24):
  • [28] Determination method of supporting time for secondary lining in tunnel considering rock creep behaviors
    Wang, Zhongwen
    Fang, Jianqin
    Xia, Caichu
    Bian, Yuewei
    Jin, Lei
    Yanshilixue Yu Gongcheng Xuebao/Chinese Journal of Rock Mechanics and Engineering, 2010, 29 (SUPPL. 1): : 3241 - 3246
  • [29] Supporting Optimal Cancer Patient Care with Integrated Staff Care
    Seagull, Deborah
    PSYCHO-ONCOLOGY, 2015, 24 : 138 - 139
  • [30] A jamming method against bistatic SAR based on modulation theory
    Ran Jinhe
    Li Xiuhe
    Shen Yang
    JOURNAL OF SYSTEMS ENGINEERING AND ELECTRONICS, 2019, 30 (03) : 504 - 510