Matheuristic and learning-oriented multi-objective artificial bee colony algorithm for energy-aware flexible assembly job shop scheduling problem

被引:10
|
作者
Hu, Yifan [1 ,2 ]
Zhang, Liping [1 ,2 ]
Zhang, Zikai [1 ,2 ]
Li, Zixiang [1 ,2 ]
Tang, Qiuhua [1 ,2 ]
机构
[1] Wuhan Univ Sci & Technol, Key Lab Met Equipment & Control Technol, Minist Educ, Wuhan 430081, Peoples R China
[2] Wuhan Univ Sci & Technol, Hubei Key Lab Mech Transmiss & Mfg Engn, Wuhan 430081, Peoples R China
基金
中国国家自然科学基金;
关键词
Flexible assembly job shop scheduling problem; Multi -objective evolutionary algorithm; Reinforcement learning; Energy consumption; Flow time; GENETIC ALGORITHM; EVOLUTIONARY ALGORITHM; FLOW-SHOP; OPTIMIZATION; FACTORIES;
D O I
10.1016/j.engappai.2024.108634
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
With the increase of mass customization, flexible job shop scheduling problem considering assembly stage has widely existed in many manufacturing industries, such as die-casting mould factories. This problem is to find a reasonable machine assignment and operation sequence both in fabrication and assembly stages and simultaneously maximize production efficiency. In reality, energy shortages and environmental pollution have given an impetus to the development of energy-aware production scheduling problems. In this study, we address an energy-aware flexible assembly job shop scheduling problem (EFAJSP) with the objectives of minimizing flow time and energy consumption and first develop a mixed-integer linear programming (MILP) model to solve EFAJSP problem. Then, the model-specific characteristics are extracted and applied to a matheuristic decoding method for exploring the Pareto optimal solution. Due to the complexity of EFAJSP problem, a matheuristic and learning-oriented multi-objective artificial bee colony algorithm (MLABC), which combines the advantages of mathematical programming, reinforcement learning and meta-heuristic algorithm, is proposed. In addition, an initialization, destruction/construction operator and population update operator are proposed and work together to improve the exploration and exploitation performance of the proposed MLABC. Finally, numerical experimental results demonstrate the effectiveness of the proposed MILP model and the superiority of the MLABC over other algorithms in the literature.
引用
收藏
页数:16
相关论文
共 50 条
  • [31] An improved artificial bee colony algorithm for fuzzy flexible job-shop scheduling problem
    Zheng X.-C.
    Gong W.-Y.
    Gong, Wen-Yin (wygong@cug.edu.cn), 1600, South China University of Technology (37): : 1284 - 1292
  • [32] ARTIFICIAL BEE COLONY ALGORITHM WITH GENETIC ALGORITHM FOR JOB SHOP SCHEDULING PROBLEM
    Ye Lvshan
    Yuan Dongzhi
    Yu Weiyu
    2017 INTERNATIONAL SYMPOSIUM ON INTELLIGENT SIGNAL PROCESSING AND COMMUNICATION SYSTEMS (ISPACS 2017), 2017, : 433 - 438
  • [33] Improved artificial bee colony algorithm for distributed and flexible job-shop scheduling problem
    Wu R.
    Guo S.-S.
    Li Y.-B.
    Wang L.
    Xu W.-X.
    Kongzhi yu Juece/Control and Decision, 2019, 34 (12): : 2527 - 2536
  • [34] A hybrid artificial bee colony algorithm for a flexible job shop scheduling problem with overlapping in operations
    Meng, Tao
    Pan, Quan-Ke
    Sang, Hong-Yan
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2018, 56 (16) : 5278 - 5292
  • [35] A hybrid artificial bee colony algorithm for the fuzzy flexible job-shop scheduling problem
    Wang, Ling
    Zhou, Gang
    Xu, Ye
    Liu, Min
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (12) : 3593 - 3608
  • [36] Application of multi-objective memetic algorithm in multi-objective flexible job-shop scheduling problem
    Zhenwen, H.U.
    Academic Journal of Manufacturing Engineering, 2019, 17 (03): : 24 - 28
  • [37] A decomposition-based artificial bee colony algorithm for the multi-objective flexible jobshop scheduling problem
    Sassi, Jamila
    Alaya, Ines
    Borne, Pierre
    Tagina, Moncef
    ENGINEERING OPTIMIZATION, 2022, 54 (03) : 524 - 538
  • [38] MILP models for energy-aware flexible job shop scheduling problem
    Meng, Leilei
    Zhang, Chaoyong
    Shao, Xinyu
    Ren, Yaping
    JOURNAL OF CLEANER PRODUCTION, 2019, 210 : 710 - 723
  • [39] A learning-driven multi-objective cooperative artificial bee colony algorithm for distributed flexible job shop scheduling problems with preventive maintenance and transportation operations
    Zhang, Zhengpei
    Fu, Yaping
    Gao, Kaizhou
    Pan, Quanke
    Huang, Min
    COMPUTERS & INDUSTRIAL ENGINEERING, 2024, 196
  • [40] A Hybrid Artificial Bee Colony Algorithm for Flexible Job Shop Scheduling Problems
    Li, Jun-qing
    Pan, Quan-ke
    Xie, Sheng-xian
    Wang, Song
    INTERNATIONAL JOURNAL OF COMPUTERS COMMUNICATIONS & CONTROL, 2011, 6 (02) : 286 - 296