Septage treatment using the First Stage of French Vertical Flow Constructed Wetlands: From the beginning to the closure of the system

被引:0
|
作者
Arevalo-Durazno, Maria B. [1 ]
Zumalacarregui, Jorge A. Garcia [2 ,3 ]
Ho, Long [4 ]
Narvaez, Andrea [2 ]
Alvarado, Andres [2 ,5 ]
机构
[1] Univ Azuay, Fac Ciencia & Tecnol, Ave 24 Mayo 7-77 & Hernan Malo, Cuenca, Ecuador
[2] Univ Cuenca, Dept Recursos Hidr & Ciencias Ambientales, Ave Victor Albornoz & Calle Cerezos, Cuenca, Ecuador
[3] Univ Cuenca, Fac Ciencias Agr, Av 12 Octubre & Diego Tapia, Cuenca, Ecuador
[4] Univ Ghent, Dept Anim Sci & Aquat Ecol, Coupure Links 653, Ghent, Belgium
[5] Univ Cuenca, Fac Ingn, Av Victor Albornoz & Calle Cerezos, Cuenca, Ecuador
关键词
Septage treatment; Vertical flow constructed wetlands; French system; Percolate impounding; Start-up; Wetland system closure; SLUDGE TREATMENT; PERFORMANCE; MINERALIZATION; CLIMATE; BEDS;
D O I
10.1016/j.ecoleng.2024.107329
中图分类号
Q14 [生态学(生物生态学)];
学科分类号
071012 ; 0713 ;
摘要
The First Stage of French Vertical Flow Constructed Wetlands (FS-FVFCW) offers a sustainable solution for treating septage. The system operates through distinct phases: start-up, full operation and final rest. During full operation, factors such as feeding duration, rest periods and percolate impounding significantly affect performance. This study assessed the performance of a pilot-scale Modified FS-FVFCW in Northern Tropical Andes, from start-up to closure stages under three operational scenarios. These scenarios varied in planted/unplanted conditions and percolate drainage/impounding. A four-month start-up phase proved adequate for vegetation growth and adaptation, achieving over 50% COD removal efficiency. Percolate retention (impounding) during operation notably improved COD and TS removal, increasing efficiencies from 49% to approximately 90% for COD and from 39% to around 70% for TS. Plant presence contributed to mosquito control and odour reduction but had minimal impact on removal efficiencies. The pilot demonstrated significant dewatering potential, with sludge deposit samples showing water content below 76% across all scenarios after 24 h; and a 10% reduction in VS/TS ratio during the operational resting period. After a 5-month closure, the sludge deposit layer exhibited organic matter content similar to long-rested sludge, albeit with persistent faecal contamination.
引用
收藏
页数:9
相关论文
共 50 条
  • [21] Dye wastewater treatment by vertical-flow constructed wetlands
    Hussein, Amjad
    Scholz, Miklas
    ECOLOGICAL ENGINEERING, 2017, 101 : 28 - 38
  • [22] Optimization of subsurface vertical flow constructed wetlands for wastewater treatment
    Langergraber, G.
    Prandtstetten, Ch.
    Pressl, A.
    Rohrhofer, R.
    Haberl, R.
    WATER SCIENCE AND TECHNOLOGY, 2007, 55 (07) : 71 - 78
  • [23] Benzene removal with vertical-flow constructed treatment wetlands
    Eke, Paul E.
    Scholz, Miklas
    JOURNAL OF CHEMICAL TECHNOLOGY AND BIOTECHNOLOGY, 2008, 83 (01) : 55 - 63
  • [24] Treatment of septage in constructed wetlands in tropical climate:: lessons learnt from seven years of operation
    Koottatep, T
    Surinkul, N
    Polprasert, C
    Kamal, ASM
    Koné, D
    Montangero, A
    Heinss, U
    Strauss, M
    WATER SCIENCE AND TECHNOLOGY, 2005, 51 (09) : 119 - 126
  • [25] Nitrogen removal performance and microbiological characteristics for the landfill leachate treatment in a three-stage vertical flow constructed wetlands system
    Wang, Hu
    Yang, Cen
    Wang, Bing
    He, Zhao
    Fu, Tianling
    ENVIRONMENTAL TECHNOLOGY & INNOVATION, 2022, 28
  • [26] The interaction between outflow dynamics and removal of NH4+-N in a vertical flow constructed wetlands treating septage
    Tan, Y. Y.
    Tang, F. E.
    Saptoro, A.
    Khor, E. H.
    CIVIL, ARCHITECTURE AND ENVIRONMENTAL ENGINEERING, VOLS 1 AND 2, 2017, : 1141 - 1146
  • [27] Study on sand clogging in two-stage vertical flow constructed wetlands
    Lu XiuQing
    Zhan DeHao
    Wu ZhenBin
    2009 3RD INTERNATIONAL CONFERENCE ON BIOINFORMATICS AND BIOMEDICAL ENGINEERING, VOLS 1-11, 2009, : 4584 - +
  • [28] Performance of an integrated system combining microalgae and vertical flow constructed wetlands for urban wastewater treatment
    Silveira, Elizandro Oliveira
    Moura, Daiane
    Rieger, Alexandre
    Machado, ASnio Leandro
    Lutterbeck, Carlos Alexandre
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2017, 24 (25) : 20469 - 20478
  • [29] Performance of an integrated system combining microalgae and vertical flow constructed wetlands for urban wastewater treatment
    Elizandro Oliveira Silveira
    Daiane Moura
    Alexandre Rieger
    Ênio Leandro Machado
    Carlos Alexandre Lutterbeck
    Environmental Science and Pollution Research, 2017, 24 : 20469 - 20478
  • [30] Wastewater treatment by tropical plants in vertical-flow constructed wetlands
    Kantawanichkul, S
    Pilaila, S
    Tanapiyawanich, W
    Tikampornpittaya, W
    Kamkrua, S
    WATER SCIENCE AND TECHNOLOGY, 1999, 40 (03) : 173 - 178