Factors that affect safety of tower crane installation/dismantling in construction industry

被引:70
|
作者
Shin, In Jae [1 ]
机构
[1] Minist Employment & Labor, Seoul Adm, Seoul, South Korea
关键词
Tower crane; Installation/dismantling; Construction safety; Accident; FATALITIES; ACCIDENT; FAILURE; DEMAND; IMPACT; SITES; TIME;
D O I
10.1016/j.ssci.2014.10.010
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Construction of high-rise buildings, large-scale apartment blocks, or construction in urban areas (especially busy downtowns) demands increasingly greater use of tower cranes. Therefore, the installation and dismantling of tower cranes on construction sites is an inevitable task, but also one of the most dangerous in the construction industry. Accidents during installation (including assembling and climbing) or dismantling of tower cranes incur the loss of workers' lives as well as delays in construction schedules and/or damage to buildings under construction. The aim of this paper is to investigate factors that contribute to accidents during tower crane installation/dismantling in Korea. Accident analysis and focus group interviews (FGIs) were conducted with people involved in crane work. A total of 38 fatal accident cases involving tower cranes occurred between 2001 and 2011. Accidents occurring during installation/dismantling of tower cranes accounted for 68.4% of all fatal accidents. Accident analysis identified "Not following work procedures" as one of the main causes of these accidents, followed by "unsafe acts of workers." The FGIs investigation revealed the following factors that adversely affected the safety of the tower crane installation/dismantling: competence of the workers; roles of stakeholders such as principal contractors in the tasks; deterioration of tower crane components; and working conditions for conducting the tasks. These results may provide regulators as well as practitioners with insights for improving the safety of tower crane installation/dismantling. (C) 2014 Elsevier Ltd. All rights reserved.
引用
收藏
页码:379 / 390
页数:12
相关论文
共 50 条
  • [41] RADIO CRANE CONTROLS: FACTORS INVOLVED IN SELECTION AND INSTALLATION.
    Aiken II, Robert C.
    Plant Engineering (Barrington, Illinois), 1985, 39 (15 A): : 68 - 72
  • [42] Construction Safety and Health Factors at the Industry Level: The Case of Singapore
    Chea, Charles Y. J.
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2007, 12 (02) : 81 - 99
  • [43] Investigating Factors of Safety Culture Assessment in Construction Industry Projects
    Tehrani, Vahid Zeinalabedin
    Rezaifar, Omid
    Gholhaki, Majid
    Khosravi, Yahya
    CIVIL ENGINEERING JOURNAL-TEHRAN, 2019, 5 (04): : 971 - 983
  • [44] Estimating and visualizing the exposure to tower crane operation hazards on construction sites
    Hu, Songbo
    Fang, Yihai
    Moehler, Robert
    SAFETY SCIENCE, 2023, 160
  • [45] Factors influencing the performance of safety programmes in the Ghanaian construction industry
    Agyekum, Kofi
    Simons, Barbara
    Botchway, Seth Yeboah
    ACTA STRUCTILIA, 2018, 25 (02) : 39 - 68
  • [46] Vision-Based Tower Crane Tracking for Understanding Construction Activity
    Yang, Jun
    Vela, Patricio
    Teizer, Jochen
    Shi, Zhongke
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2014, 28 (01) : 103 - 112
  • [47] Safety Personnel's Perceptions on the Significant Factors that Affect Construction Projects Safety Performance
    Abas, Nor Haslinda
    Yusuf, Nurhalimah
    Rahmat, Muhamad Hanafi
    Ghing, Tong Yean
    INTERNATIONAL JOURNAL OF INTEGRATED ENGINEERING, 2021, 13 (03): : 1 - 8
  • [48] System Hazard Analysis of Tower Crane in Different Phases on Construction Site
    Jiang, Ling
    Zhao, Tingsheng
    Zhang, Wei
    Hu, Junjie
    ADVANCES IN CIVIL ENGINEERING, 2021, 2021
  • [49] Safety evaluation of intelligent tower crane based on finite element theory
    Lu, Xue-Yu, 1600, Sila Science, University Mah Mekan Sok, No 24, Trabzon, Turkey (32):
  • [50] PRESSURE VESSEL SAFETY - DESIGN, CONSTRUCTION AND INSTALLATION
    SNYDER, AI
    MECHANICAL ENGINEERING, 1970, 92 (12) : 56 - &