Study on the Influence of Adjacent Double Deep Foundation Pit Excavation Sequence on Existing Tunnel Deformation Based on HSS Constitutive Model

被引:2
|
作者
Wang, Sijun [1 ]
Wang, Wenting [1 ]
Yang, Huan [1 ]
Zhao, Debin [2 ]
Liu, Yang [2 ]
机构
[1] Second Engn CCCC Third Highway Engn Co Ltd, Tianjin 301800, Peoples R China
[2] Univ Sci & Technol Beijing, Dept Civil Engn, Beijing 100083, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2024年 / 14卷 / 09期
关键词
HSS small-strain model; adjacent twin pits; excavation sequence; tunnel deformation; numerical simulation;
D O I
10.3390/app14093626
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
With the increase in the number of buildings along the subway, the impact of building construction on the adjacent subway tunnels has gradually come to the forefront and become an important problem to be solved in the engineering field. In particular, the excavation and unloading process of deep foundation pits will trigger an additional deformation of the subway structure, which may pose a serious threat to the safety and stability of subway tunnels. This article is based on a foundation pit project in the sub-center of Beijing, focusing on the form of a connected double foundation pit. Using the HSS constitutive model for soil materials, this study simulates the deformation response of adjacent existing subway tunnels under three excavation sequences: sequential excavation, simultaneous excavation, and the comprehensive excavation of the connected double foundation pits. The study shows that, from the point of view of the total displacement of the whole construction process, the impact of a synchronized excavation of double pits on the existing tunnel line is relatively large in the process, and the impact of sequential excavation is relatively small in the construction cycle. The result of the similarity of the excavation sequence is the similarity of the impact trend. The volume of excavated earth determines the value of displacement change for each excavation scenario in each working condition and is also responsible for the convergence of changes. The trend of total tunnel displacement is more consistent with that of vertical displacement, which is dominated by vertical displacement, with horizontal displacement having a relatively small influence. The maximum value of the total tunnel displacement occurs at the side of the tunnel near the excavation area, and the direction is inclined to the excavation area. The application of supporting structures, especially the center plate and the bottom plate, can suppress the vertical deformation of the tunnel bulge.
引用
收藏
页数:18
相关论文
共 50 条
  • [41] Research on deformation prediction of deep foundation pit excavation based on GWO-ELM model
    Yang, Sanqiang
    Yang, Zhenyu
    Zhang, Leifeng
    Guo, Yapeng
    Wang, Ju
    Huang, Jingyong
    ELECTRONIC RESEARCH ARCHIVE, 2023, 31 (09): : 5685 - 5700
  • [42] Influence of Foundation Pit Groups' Excavation on the Deformation Characteristics of Adjacent Railway Subgrade and Protection Measures
    Lei, Huayang
    Zhan, Bishun
    Feng, Shuangxi
    Amin, Muhammad
    GEOTECHNICAL AND GEOLOGICAL ENGINEERING, 2023, 41 (07) : 3877 - 3895
  • [43] Influence of Foundation Pit Groups’ Excavation on the Deformation Characteristics of Adjacent Railway Subgrade and Protection Measures
    Huayang Lei
    Bishun Zhan
    Shuangxi Feng
    Muhammad Amin
    Geotechnical and Geological Engineering, 2023, 41 : 3877 - 3895
  • [44] Predicting existing tunnel deformation from adjacent foundation pit construction using hybrid machine learning
    Wu, Xianguo
    Feng, Zongbao
    Liu, Jun
    Chen, Hongyu
    Liu, Yang
    AUTOMATION IN CONSTRUCTION, 2024, 165
  • [45] Influence of Cairo Metro Tunnel Excavation on Pile Deep Foundation of the Adjacent Underground Structures: Numerical Study
    Ayasrah, Mo'men
    Qiu, Hongsheng
    Zhang, Xiedong
    SYMMETRY-BASEL, 2021, 13 (03):
  • [46] Deformation of deep foundation pits due to excavation and dewatering based on HSS model and Modified Cam-Clay Model
    College of Civil Engineering and Architecture, Guangxi University, Nanning
    530004, China
    不详
    530004, China
    Shuili Xuebao, (231-235):
  • [47] Study on stress and deformation of shield tunnel plate under unloading of foundation pit excavation
    Shuaihua Ye
    Jian Zhou
    Arabian Journal of Geosciences, 2021, 14 (23)
  • [48] Calculation of foundation pit deformation caused by deep excavation considering influence of loading and unloading
    Ming Huang
    Xing-rong Liu
    Nai-yang Zhang
    Qi-wei Shen
    Journal of Central South University, 2017, 24 : 2164 - 2171
  • [49] Influence of foundation excavation pit on adjacent metro tunnel using fluid-solid mechanics theory
    Huang K.
    Yang W.
    Ma Q.
    An Y.
    Li Y.
    Zhou J.
    Qiu L.
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2019, 50 (01): : 198 - 205
  • [50] Transverse Force Analysis of Adjacent Shield Tunnel Caused by Foundation Pit Excavation Considering Deformation of Retaining Structures
    Zhang, Xinhai
    Wei, Gang
    Lin, Xinbei
    Xia, Chang
    Wei, Xinjiang
    SYMMETRY-BASEL, 2021, 13 (08):