共 50 条
- [41] Stay Cable Tubes Positioning Control of Prestressed Concrete Low-pylon Cable-stayed Bridge PROGRESS IN INDUSTRIAL AND CIVIL ENGINEERING, PTS. 1-5, 2012, 204-208 : 1971 - 1975
- [45] Study on the Full Scale Model Test for Pylon Segment of Cable-Stayed Bridge SUSTAINABLE CITIES DEVELOPMENT AND ENVIRONMENT PROTECTION, PTS 1-3, 2013, 361-363 : 1362 - 1365
- [46] Experimental study of fatigue on orthotropic steel deck of cable-stayed bridge Zhejiang Daxue Xuebao (Gongxue Ban)/Journal of Zhejiang University (Engineering Science), 2019, 53 (06): : 1071 - 1082
- [47] Double-layer model updating for steel-concrete composite beam cable-stayed bridge based on GPS J. Southeast Univ. Engl. Ed., 2008, 1 (80-84):
- [48] Characteristics of Interaction between Tracks and Long-span Cable-stayed Bridge with Steel-concrete Composite Beam Journal of Railway Engineering Society, 2019, 36 (09): : 11 - 16
- [49] Experimental study of hybrid joint segment for cable-stayed composite truss bridge with double deck Jianzhu Jiegou Xuebao/Journal of Building Structures, 2013, 34 (SUPPL.1): : 45 - 51
- [50] Mechanical property of cable-pylon anchorage zone of cable-stayed bridge with steel box girder Zongguo Gonglu Xuebao, 2007, 4 (48-52):