Analysis of Shield Tunneling Parameters and Research on Prediction Model of Tunneling Excavation Speed in Volcanic Ash Strata of Jakarta-Bandung High-Speed Railway Project

被引:0
|
作者
Fan, Xiaomin [1 ]
Tan, Zhongsheng [1 ]
Zhang, Baojin [1 ]
Zhao, Jinpeng [1 ]
Cao, Yuxin [2 ]
Jiang, Yongtao [2 ]
机构
[1] Beijing Jiaotong Univ, Key Lab Minist Educ Urban Underground Engn, Beijing 100044, Peoples R China
[2] Power China Railway Construct Co Ltd, Beijing 100044, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2024年 / 14卷 / 11期
关键词
tunnel engineering; excavation parameters; volcanic ash strata; optimization; random forest; MACHINE; NETWORK;
D O I
10.3390/app14114623
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
Insufficient investigations have been conducted on the analysis of shield tunneling parameters and the prediction of the tunneling excavation speed in formations composed of volcanic ash strata. To address this issue, we employ a comprehensive approach utilizing literature research, mathematical statistics, and other methodologies, centered on the analysis of the No. 1 Tunnel of the Jakarta-Bandung High-Speed Railway. Our focus is on examining the evolution patterns and inter-relationships of shield tunneling parameters within volcanic ash strata. Subsequently, we propose an optimized strategy for these tunneling parameters. By employing six machine-learning algorithms to construct prediction models, we compare and analyze their performance in predicting the tunneling excavation speed. The results indicate a positive correlation between slurry pressure and tunnel depth in volcanic ash strata, suggesting that the grouting pressure should exceed the slurry pressure by approximately 0.22 MPa. In the composite stratum of "volcanic ash debris + round gravel", the cutter torque exhibits a strong negative correlation with the total thrust (-0.77). Due to tool wear and ground resistance, the excavation speed and cutter speed are weakly negatively correlated. Compared to other strata, shield tunneling in volcanic ash strata exhibits larger grouting pressure fluctuations, slower tunneling excavation speed, greater total thrust, higher cutter torque, and lower cutter speed. Regarding shield tunneling excavation speed prediction, the ranking of the algorithm performance is RF > DNN > ANN > BPNN > MNR > SVM, with RF achieving a decision coefficient of 0.829. The RF model is well-suited for predicting the shield structure tunneling excavation speed.
引用
收藏
页数:19
相关论文
共 33 条
  • [31] Research of K-MEANS Analysis Model on High-Speed Railway CIR Device Maintenance
    Fan, Jia-ming
    Liu, Feng
    Fan, Jian-ping
    2017 IEEE INTERNATIONAL CONFERENCE ON PROGNOSTICS AND HEALTH MANAGEMENT (ICPHM), 2017, : 199 - 204
  • [32] A multi-parameters assessment method and prediction model for ground vibration under the high-speed railway bridge
    Yuan, Wenya
    Jia, Baoxin
    Zhou, Zhiyang
    Zhang, Jing
    An, Puzhen
    SCIENTIFIC REPORTS, 2025, 15 (01):
  • [33] Research on the Model of High-Speed Railway Station Security Resource Scheduling Based on Dynamic Passenger Flow Prediction
    Li, Mengkun
    Sun, Yitian
    Xu, Chunjie
    Du, Chen'ao
    Shao, Wei
    APPLIED SCIENCES-BASEL, 2024, 14 (24):