Fuzzy Comprehensive Evaluation of Collapse Risk in Mountain Tunnels Based on Game Theory

被引:4
|
作者
Zheng, Weiqiang [1 ]
Xu, Shixiang [1 ]
Wang, Zecheng [1 ]
机构
[1] East China Univ Technol, Sch Civil & Architecture Engn, Nanchang 330013, Peoples R China
来源
APPLIED SCIENCES-BASEL | 2024年 / 14卷 / 12期
基金
中国国家自然科学基金;
关键词
tunnel collapse; game theory; portfolio assignment; D-number hierarchical analysis; CRITIC method; risk evaluation;
D O I
10.3390/app14125163
中图分类号
O6 [化学];
学科分类号
0703 ;
摘要
In view of the problem that mountain tunnel construction is prone to collapse risk and disaster accidents, this paper proposes a fuzzy comprehensive evaluation method based on CRITIC and D-AHP combined weighting, which can effectively improve the accuracy of mountain tunnel collapse risk evaluation and reduce construction risks. This method combines the improved subjective weighting method D-number analytic hierarchy process and the more scientific and reasonable objective weighting method CRITIC method for combined weighting and uses game theory to optimize the weights, which improves its accuracy compared to traditional evaluation methods and makes up for the lack of subjective and objective weighting of a single evaluation method. The results show that the introduction of the D-number theory can reduce the impact of an uncertain environment on the evaluation results. The risk levels of the sample sections are all between three and four, which is consistent with the actual situation of the project, indicating that the evaluation model is feasible.
引用
收藏
页数:15
相关论文
共 50 条
  • [31] Risk assessment of TBM construction for tunnels based on AHP and fuzzy synthetic evaluation
    Zhao, Yan-Xi
    Xu, Wei-Ya
    Yantu Lixue/Rock and Soil Mechanics, 2009, 30 (03): : 793 - 798
  • [32] The Information Security Risk Assessment Based on Fuzzy Comprehensive Evaluation
    Li Guohong
    Cai Yongkai
    PROCEEDINGS OF THE 15TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS A-C, 2008, : 2027 - 2031
  • [33] Snow Disaster Risk Assessment Based on Fuzzy Comprehensive Evaluation
    Lv, Chao
    Gong, Huili
    Wang, Bo
    2010 18TH INTERNATIONAL CONFERENCE ON GEOINFORMATICS, 2010,
  • [34] The Risk Assessment and Management based on Fuzzy Comprehensive Evaluation Model
    Zhang, Dong
    Wang, Dinghui
    Ren, Xiquan
    Hou, Yingqi
    2013 INTERNATIONAL CONFERENCE ON ECONOMIC, BUSINESS MANAGEMENT AND EDUCATION INNOVATION (EBMEI 2013), VOL 17, 2013, 17 : 340 - 344
  • [35] ANALYSIS OF THE RISK OF CAPITAL FLOW BASED ON FUZZY COMPREHENSIVE EVALUATION
    Wang, Xi-Ping
    PROCEEDINGS OF 2009 INTERNATIONAL CONFERENCE ON MACHINE LEARNING AND CYBERNETICS, VOLS 1-6, 2009, : 24 - 28
  • [36] FUZZY EXTENSION MODEL OF CULVERTS SAFETY EVALUATION BASED ON GAME THEORY
    Wang Quan
    Zheng Dongjian
    PROCEEDINGS OF THE 36TH IAHR WORLD CONGRESS: DELTAS OF THE FUTURE AND WHAT HAPPENS UPSTREAM, 2015, : 4215 - 4224
  • [37] Study on the risk assessment of water inrush in karst tunnels based on intuitionistic fuzzy theory
    Wang, Yingchao
    Chen, Fan
    Yin, Xin
    Geng, Fan
    GEOMATICS NATURAL HAZARDS & RISK, 2019, 10 (01) : 1070 - 1083
  • [38] Risk Evaluation of Investment Projects Based on Fuzzy Theory
    An Ya-Qin
    Wang Ya-Jun
    He Song-Bai
    EBM 2010: INTERNATIONAL CONFERENCE ON ENGINEERING AND BUSINESS MANAGEMENT, VOLS 1-8, 2010, : 4289 - 4292
  • [39] Fuzzy comprehensive evaluation model of net information resource based on fuzzy sets theory
    Ma, Haiqun
    Lv, Hong
    Wuhan Daxue Xuebao (Xinxi Kexue Ban)/Geomatics and Information Science of Wuhan University, 2010, 35 (SPECIAL ISSUE 2): : 125 - 129
  • [40] Risk Assessment of a Tunnel Collapse in a Mountain Tunnel Based on the Attribute Synthetic Evaluation System
    Wang, Benshuo
    Li, Shucai
    Zhang, Qianqing
    Li, Liping
    Zhang, Qian
    Xu, Fei
    GEO-CHINA 2016: EMERGING TECHNOLOGIES IN TUNNEL ENGINEERING, MODELING, DESIGN, CONSTRUCTION, REPAIR, AND REHABILITATION, 2016, (260): : 198 - 209