Mitigating the effects of delay risk in building construction projects in Ghana

被引:0
|
作者
Wepari, Joseph Wesong [1 ]
Donkor, Mark Bright [2 ]
Kusi, Elijah [3 ]
机构
[1] Akenten Appiah Menka Univ Skills Training & Entrep, Dept Construct Technol & Management Educ, Kumasi, Ghana
[2] Akenten Appiah Menka Univ Skills Training & Entrep, Dept Wood Technol Educ, Kumasi, Ghana
[3] Akenten Appiah Menka Univ Skills Training & Entrep, Dept Architecture & Civil Engn, Kumasi, Ghana
来源
COGENT ENGINEERING | 2024年 / 11卷 / 01期
关键词
Delay risk; effects of causal factors; mitigating effects; construction projects; CAUSATIVE FACTORS; IDENTIFICATION; PERFORMANCE;
D O I
10.1080/23311916.2024.2345522
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The completion of a project within stipulated time duration is a key variable of project performance. However, delays in completion of projects remains a common occurrence in the construction industry in Ghana. Delays in completion result in resources employed on such projects to exceed what has been planned. The aim of the study is to explore the effects of delays and develop strategies/framework for mitigating the effects of delay risk in building construction projects in Ghana. A cross-sectional survey research design was adopted with structured questionnaires administered to construction professionals in the building construction sector. A total of Six Hundred and Forty-four (644) questionnaires were distributed to the respondents with Three Hundred Thirty (330) questionnaires were recovered which represents a response rate of 51.2%. The findings of the study suggest that; economic losses to the contractor (X<overline>=4.28, sigma=.672), loss of integrity or image of project participants (X<overline>=4.37, sigma=.703), cost overrun X = 4.32, sigma = .913), compromised commercial relationships between project stakeholders X = 4.23, sigma = .761), disputes, and reduced profitability of clients' organization were the severest forms of the effects of delays (X = 4.09, sigma = .822). The study concluded that delays adversely affect the integrity or image of project participants and are the most severe effects of delays in the Ghanaian construction industry. The study recommended that, respecting payment schedule and honoring payment certificates promptly and clarity in contract provisions were the effective measures to mitigate the effects of delays.
引用
收藏
页数:20
相关论文
共 50 条
  • [31] Timber Construction: Construction - Building Physics - Projects
    Lueckmann, Rudolf
    BAUTECHNIK, 2022, 99 (08) : 614 - 614
  • [32] Bayesian network based decision support for predicting and mitigating delay risk in TBM tunnel projects
    Balta, G. C. Koseoglu
    Dikmen, I
    Birgonul, M. T.
    AUTOMATION IN CONSTRUCTION, 2021, 129
  • [33] Perceptions of Threat Risk Frequency and Impact on Construction Projects in Ghana: Opinion Survey Findings
    Chileshe, Nicholas
    Yirenkyi-Fianko, Adwoa Boadua
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2011, 16 (02) : 115 - 149
  • [34] Assessing risk allocation preferences of partners in international construction joint venture projects in Ghana
    Akunyumu, Stephen
    Fugar, Frank D. K.
    Adinyira, Emmanuel
    JOURNAL OF FINANCIAL MANAGEMENT OF PROPERTY AND CONSTRUCTION, 2025, 30 (01) : 111 - 136
  • [35] Analysing delay causes and effects in Ghanaian state housing construction projects
    Amoatey, Charles Teye
    Ameyaw, Yaa Asabea
    Adaku, Ebenezer
    Famiyeh, Samuel
    INTERNATIONAL JOURNAL OF MANAGING PROJECTS IN BUSINESS, 2015, 8 (01) : 198 - 214
  • [36] Causes of delay in construction projects in Oman
    Umar, Tariq
    MIDDLE EAST JOURNAL OF MANAGEMENT, 2018, 5 (02) : 121 - 136
  • [37] Delay Fees in the Procurement of Construction Projects
    Nystrom, Johan
    Nilsson, Jan-Eric
    Borjesson, Maria
    JOURNAL OF TRANSPORT ECONOMICS AND POLICY, 2019, 53 : 348 - 363
  • [38] War uncertainties delay construction projects
    Stell, J
    OIL & GAS JOURNAL, 2003, 101 (15) : 66 - +
  • [39] Review of Delay Causes in Construction Projects
    AlGheth, Abdulhamid
    Sayuti, Md Ishak
    PROCEEDINGS OF AICCE'19: TRANSFORMING THE NATION FOR A SUSTAINABLE TOMORROW, 2020, 53 : 429 - 437
  • [40] Causes of Delay in Road Construction Projects
    Mahamid, Ibrahim
    Bruland, Amund
    Dmaidi, Nabil
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2012, 28 (03) : 300 - 310