Mitigating the effects of delay risk in building construction projects in Ghana

被引:0
|
作者
Wepari, Joseph Wesong [1 ]
Donkor, Mark Bright [2 ]
Kusi, Elijah [3 ]
机构
[1] Akenten Appiah Menka Univ Skills Training & Entrep, Dept Construct Technol & Management Educ, Kumasi, Ghana
[2] Akenten Appiah Menka Univ Skills Training & Entrep, Dept Wood Technol Educ, Kumasi, Ghana
[3] Akenten Appiah Menka Univ Skills Training & Entrep, Dept Architecture & Civil Engn, Kumasi, Ghana
来源
COGENT ENGINEERING | 2024年 / 11卷 / 01期
关键词
Delay risk; effects of causal factors; mitigating effects; construction projects; CAUSATIVE FACTORS; IDENTIFICATION; PERFORMANCE;
D O I
10.1080/23311916.2024.2345522
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The completion of a project within stipulated time duration is a key variable of project performance. However, delays in completion of projects remains a common occurrence in the construction industry in Ghana. Delays in completion result in resources employed on such projects to exceed what has been planned. The aim of the study is to explore the effects of delays and develop strategies/framework for mitigating the effects of delay risk in building construction projects in Ghana. A cross-sectional survey research design was adopted with structured questionnaires administered to construction professionals in the building construction sector. A total of Six Hundred and Forty-four (644) questionnaires were distributed to the respondents with Three Hundred Thirty (330) questionnaires were recovered which represents a response rate of 51.2%. The findings of the study suggest that; economic losses to the contractor (X<overline>=4.28, sigma=.672), loss of integrity or image of project participants (X<overline>=4.37, sigma=.703), cost overrun X = 4.32, sigma = .913), compromised commercial relationships between project stakeholders X = 4.23, sigma = .761), disputes, and reduced profitability of clients' organization were the severest forms of the effects of delays (X = 4.09, sigma = .822). The study concluded that delays adversely affect the integrity or image of project participants and are the most severe effects of delays in the Ghanaian construction industry. The study recommended that, respecting payment schedule and honoring payment certificates promptly and clarity in contract provisions were the effective measures to mitigate the effects of delays.
引用
收藏
页数:20
相关论文
共 50 条
  • [1] Delays in Building Construction Projects in Ghana
    Fugar, Frank D. K.
    Agyakwah-Baah, Adwoa B.
    CONSTRUCTION ECONOMICS AND BUILDING, 2010, 10 (1-2):
  • [2] Assessment of systematic risk management practices on building construction projects in Ghana
    Boateng, Ali
    Ameyaw, Collins
    Mensah, Sarfo
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2022, 22 (16) : 3128 - 3136
  • [3] Risk matrix for delay causes in building construction projects in KSA
    Alfraidi, Yahya Nasser
    INTERNATIONAL JOURNAL OF ADVANCED AND APPLIED SCIENCES, 2018, 5 (06): : 93 - 97
  • [4] Influence of Subcontractor Risk Management on Quality Performance of Building Construction Projects in Ghana
    Adinyira, Emmanuel
    Agyekum, Kofi
    Danku, James Cofie
    Addison, Prince
    Kukah, Augustine Senanu
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2020, 25 (02) : 175 - 197
  • [5] RANKING OF EFFECTS OF CONSTRUCTION DELAY: EVIDENCE FROM MALAYSIAN BUILDING PROJECTS
    Ullah, K.
    Khan, M. S.
    Lakhiar, M. T.
    Vighio, A. A.
    Sohu, S.
    JOURNAL OF APPLIED ENGINEERING SCIENCES, 2018, 8 (01): : 79 - 84
  • [6] Influence of BIM and Lean on mitigating delay factors in building projects
    Perez, Yeimi
    Avila, Jeffer
    Sanchez, Omar
    RESULTS IN ENGINEERING, 2024, 22
  • [7] Causes of Delay in Building Construction Projects in Egypt
    El-Razek, M. E. Abd
    Bassioni, H. A.
    Mobarak, A. M.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (11) : 831 - 841
  • [8] CAUSES OF DELAY IN LARGE BUILDING CONSTRUCTION PROJECTS
    ASSAF, SA
    ALKHALIL, M
    ALHAZMI, M
    JOURNAL OF MANAGEMENT IN ENGINEERING, 1995, 11 (02) : 45 - 50
  • [9] The Investigation of the Role of RFID in Mitigating Delay Factors in Construction Projects
    Azeez, Luqman Ibrahim
    Radmehr, Mehrshad
    TEHNICKI VJESNIK-TECHNICAL GAZETTE, 2022, 29 (03): : 933 - 942
  • [10] Critical Factors and Mitigating Measures of Construction Delays of Pakistani Building Construction Projects
    Irfanullah
    Hasmori, Muhammad Fikri
    Memon, Mujtaba Hassan
    Ismail, Radzi
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2023, 14 (02): : 240 - 249