Influencing Factors of Nitrogen Removal from Low-Pollution Water by Aerated Constructed Wetland

被引:0
|
作者
Li, Lin-Lin [1 ,2 ]
Li, Rong-Tao [1 ,3 ]
Kong, Wei-Jing [1 ]
Yang, Ping-Guo [3 ]
Du, Zhi-Chao [1 ,4 ]
Bi, Bin [1 ]
Lu, Shao-Yong [1 ]
机构
[1] State Environmental Protection Key Laboratory for Lake Pollution Control, National Engineering Laboratory for Lake Pollution Control and Ecological Restoration, State Environmental Protection Scientific Observation and Research Station for Lake Dongting, B
[2] College of Water Sciences, Beijing Normal University, Beijing,100875, China
[3] College of Life Sciences, Shanxi Normal University, Linfen,041000, China
[4] School of Civil Engineering, Liaoning Technical University, Fuxin,123000, China
来源
Huanjing Kexue/Environmental Science | 2021年 / 42卷 / 12期
关键词
D O I
暂无
中图分类号
学科分类号
摘要
引用
收藏
页码:5857 / 5864
相关论文
共 50 条
  • [21] Influencing factors on nitrogen removal performance of combined biological aerated filter for secondary effluent from municipal WWTP
    Yang Yue
    Wang Hong-jie
    Zhang Jin-song
    Huang Wen-zhang
    2009 3RD INTERNATIONAL CONFERENCE ON BIOINFORMATICS AND BIOMEDICAL ENGINEERING, VOLS 1-11, 2009, : 5314 - +
  • [22] Nitrogen removal efficiencies in a free water surface constructed wetland in relation to plant coverage
    Garcia-Lledo, A.
    Ruiz-Rueda, O.
    Vilar-Sanz, A.
    Sala, L.
    Baneras, L.
    ECOLOGICAL ENGINEERING, 2011, 37 (05) : 678 - 684
  • [23] Intensified organics and nitrogen removal in the intermittent-aerated constructed wetland using a novel sludge-ceramsite as substrate
    Wu, Haiming
    Fan, Jinlin
    Zhang, Jian
    Ngo, Huu Hao
    Guo, Wenshan
    Liang, Shuang
    Lv, Jialong
    Lu, Shaoyong
    Wu, Weizhong
    Wu, Suqing
    BIORESOURCE TECHNOLOGY, 2016, 210 : 101 - 107
  • [24] Cyanobacterial Nitrogen Fixation Influences the Nitrogen Removal Efficiency in a Constructed Wetland
    Zhang, Xiaodong
    Jia, Xin
    Yan, Liang
    Wang, Jinzhi
    Kang, Xiaoming
    Cui, Lijuan
    WATER, 2017, 9 (11):
  • [25] Nitrogen removal from secondary effluent by using integrated constructed wetland system
    Xiong, Jibing
    Guo, Guangli
    Mahmood, Qaisar
    Yue, Min
    ECOLOGICAL ENGINEERING, 2011, 37 (04) : 659 - 662
  • [26] Removal of phosphorous and nitrogen from wastewater in Brachiaria-based constructed wetland
    Nandakumar, S.
    Pipit, Harsh
    Ray, Sanak
    Haritash, A. K.
    CHEMOSPHERE, 2019, 233 : 216 - 222
  • [27] Norflurazon and Simazine Removal from Surface Water Using a Constructed Wetland
    P. Chris Wilson
    Hai Lu
    Youjian Lin
    Bulletin of Environmental Contamination and Toxicology, 2011, 87 : 426 - 430
  • [28] Norflurazon and Simazine Removal from Surface Water Using a Constructed Wetland
    Wilson, P. Chris
    Lu, Hai
    Lin, Youjian
    BULLETIN OF ENVIRONMENTAL CONTAMINATION AND TOXICOLOGY, 2011, 87 (04) : 426 - 430
  • [29] Aeration strategies and total nitrogen removal in a hybrid aerated treatment wetland
    Miyazaki, Caroline Kimie
    Morvannou, Ania
    Higelin, Elodie
    Nivala, Jaime
    Molle, Pascal
    BLUE-GREEN SYSTEMS, 2023, 5 (02) : 321 - 335
  • [30] Microbial removal and plant uptake of nitrogen in constructed wetlands: mesocosm tests on influencing factors
    Tao, Wendong
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2018, 25 (36) : 36425 - 36437