Nitrogen removal from summer to winter in a field pilot-scale multistage constructed wetland-pond system

被引:2
|
作者
Tao Wang [1 ,2 ]
Liping Xiao [3 ]
Hongbin Lu [1 ,4 ]
Shaoyong Lu [1 ]
Jiaxin Li [1 ]
Xiaochun Guo [1 ]
Xiaoliang Zhao [2 ]
机构
[1] National Engineering Laboratory for Lake Pollution Control and Ecological Restoration, State Environmental Protection Scientific Observation and Research Station for Lake Dongtinghu (SEPSORSLD), State Environmental Protection Key Laboratory for Lake Pollut
[2] College of Environmental Science and Engineering, Liaoning Technical University
[3] School of Environmental and Municipal Engineering, Qingdao University of Technology
[4] College of Water Sciences, Beijing Normal University
基金
中国国家自然科学基金;
关键词
D O I
暂无
中图分类号
X52 [水体污染及其防治];
学科分类号
0815 ;
摘要
A pilot-scale multistage constructed wetland-pond(MCWP) system with a "pre-ecological oxidation pond, two-stage horizontal subsurface flow constructed wetland(HSCW) and surface flow constructed wetland(SFCW) as the core and postsubmerged plant pond" as the process was used to treat actual polluted river water in the field, and the variation in nitrogen removal from summer to winter was investigated. The results showed that the average total nitrogen(TN) removal efficiency in the MCWP was approximately 40.74%. The significant positive correlation between the daily highest temperature and the TN removal efficiency of the whole system was fitted with a nonlinear curve(R~2= 0.7192). The TN removal load rate in the HSCWs was 2.7–3.7 times that in the SFCW. The SFCW, which had high-density plants(35 plants/m2), increased the proportion of nitrogen removed by plant harvesting and microbial function. The TN transformed by Iris pseudacorus L. accounted for 54.53% in the SFCW. Furthermore, bacteria completed the nitrogen cycle in the SFCW through a variety of nitrogen removal pathways. This research not only investigated the TN removal performance in an MCWP system but also made it possible to predict the TN removal efficiency according to the daily highest temperature from summer to winter in the field.
引用
收藏
页码:249 / 262
页数:14
相关论文
共 50 条
  • [21] Pilot-Scale Removal of Arsenic and Heavy Metals from Mining Wastewater Using Adsorption Combined with Constructed Wetland
    Nguyen, Ha T. H.
    Nguyen, Bien Q.
    Duong, Thuy T.
    Bui, Anh T. K.
    Nguyen, Hang T. A.
    Cao, Ha T.
    Mai, Nhuan T.
    Nguyen, Khai M.
    Pham, Thuy T.
    Kim, Kyoung-Woong
    MINERALS, 2019, 9 (06):
  • [22] Removal of N, P, BOD5, and coliform in pilot-scale constructed wetland systems
    Jin, G
    Kelley, T
    Freeman, M
    Callahan, M
    INTERNATIONAL JOURNAL OF PHYTOREMEDIATION, 2002, 4 (02) : 127 - 141
  • [23] The nitrogen removal performance and microbial communities in a pilot multistage trickling constructed wetland for purifying polluted groundwater
    Xu, Dan
    Ling, Huilan
    Li, Zebing
    Li, Yun
    Chen, Renxiang
    Gao, Bai
    ENVIRONMENTAL SCIENCE-WATER RESEARCH & TECHNOLOGY, 2022, 8 (12) : 3079 - 3090
  • [24] Performance of a pilot-scale constructed wetland system for treating simulated ash basin water
    Dorman, Lane
    Castle, James W.
    Rodgers, John H., Jr.
    CHEMOSPHERE, 2009, 75 (07) : 939 - 947
  • [25] EFFECTS OF INTERMITTENT AERATION UNDER DIFFERENT OPERATION CONDITIONS ON THE POLLUTANT REMOVAL OF A PILOT-SCALE CONSTRUCTED WETLAND
    Liu, Mengzi
    Hu, Xuebin
    Yan, Jun
    Mei, Longyue
    Li, Xiaoting
    FRESENIUS ENVIRONMENTAL BULLETIN, 2019, 28 (2A): : 1312 - 1318
  • [26] Long-term assessment on performance and seasonal optimal operation of a full-scale integrated multiple constructed wetland-pond system
    Pu, Yashuai
    Li, Yiping
    Zhu, Liqin
    Cheng, Yu
    Nuamah, Linda A.
    Zhang, Haikuo
    Chen, Hongwei
    Du, Guanchao
    Wang, Ling
    Song, Congqing
    SCIENCE OF THE TOTAL ENVIRONMENT, 2023, 862
  • [27] Fecal sludge treatment in a pilot-scale vertical-flow constructed wetland for the removal of helminth eggs
    Nzouebet, Wilfried Arsene Letah
    Kengne, Ebenezer Soh
    Rechenburg, Andrea
    Ndangang, Jean-Jules Nana
    Noumsi, Ives Magloire Kengne
    JOURNAL OF WATER SANITATION AND HYGIENE FOR DEVELOPMENT, 2022, 12 (09) : 634 - 646
  • [28] Fate and distribution of arsenic in a process-designed pilot-scale constructed wetland treatment system
    Schwindaman, Jeffrey P.
    Castle, James W.
    Rodgers, John H., Jr.
    ECOLOGICAL ENGINEERING, 2014, 68 : 251 - 259
  • [29] Pesticide removal from cotton farm tailwater by a pilot-scale ponded wetland
    Rose, Michael T.
    Sanchez-Bayo, Francisco
    Crossan, Angus N.
    Kennedy, Ivan R.
    CHEMOSPHERE, 2006, 63 (11) : 1849 - 1858
  • [30] Treatment of Selenium in Simulated Refinery Effluent Using a Pilot-Scale Constructed Wetland Treatment System
    Spacil, Michael M.
    Rodgers, John H., Jr.
    Castle, James W.
    Gulde, Cynthia L. Murray
    Myers, James E.
    WATER AIR AND SOIL POLLUTION, 2011, 221 (1-4): : 301 - 312