共 50 条
- [1] Nitrogen removal from summer to winter in a field pilot-scale multistage constructed wetland-pond system JOURNAL OF ENVIRONMENTAL SCIENCES, 2022, 111 : 249 - 262
- [4] COLIFORM BACTERIA REMOVAL FROM SEPTIC WASTEWATER IN A PILOT-SCALE COMBINED CONSTRUCTED WETLAND SYSTEM ENVIRONMENTAL ENGINEERING AND MANAGEMENT JOURNAL, 2012, 11 (10): : 1873 - 1879
- [6] Removal of arsenic by pilot-scale vertical flow constructed wetland Frontiers of Environmental Science & Engineering, 2021, 15
- [9] Bioaugmentation in a pilot-scale constructed wetland to treat domestic wastewater in summer and autumn Environmental Science and Pollution Research, 2016, 23 : 7776 - 7785