共 50 条
- [41] Particle Swarm Optimisation for Open Shop Problems with Fuzzy Durations FOUNDATIONS ON NATURAL AND ARTIFICIAL COMPUTATION: 4TH INTERNATIONAL WORK-CONFERENCE ON THE INTERPLAY BETWEEN NATURAL AND ARTIFICIAL COMPUTATION, IWINAC 2011, PART I, 2011, 6686 : 362 - 371
- [45] Online scheduling for hybrid flexible flow shop with Open-Shop Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2019, 25 (11): : 2775 - 2787
- [47] A Two-Level Metaheuristic for the Job-Shop Scheduling Problem with Multipurpose Machines Complexity, 2022, 2022
- [48] Solving flow-shop scheduling problem by hybrid particle swarm optimization algorithm Proceedings of 2006 Chinese Control and Decision Conference, 2006, : 1006 - +
- [49] The Application of Improved Hybrid Particle Swarm Optimization Algorithm in Job Shop Scheduling Problem PROCEEDINGS OF 2019 IEEE 7TH INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND NETWORK TECHNOLOGY (ICCSNT 2019), 2019, : 49 - 52
- [50] Improved New Particle Swarm Algorithm Solving Job Shop Scheduling Optimization Problem 2013 3RD INTERNATIONAL CONFERENCE ON COMPUTER SCIENCE AND NETWORK TECHNOLOGY (ICCSNT), 2013, : 148 - 150