SEQUENTIAL IMPERFECT PREVENTIVE MAINTENANCE POLICIES - A CASE-STUDY

被引:8
|
作者
JAYABALAN, V [1 ]
CHAUDHURI, D [1 ]
机构
[1] INDIAN INST TECHNOL,DEPT HUMANITIES & SOCIAL SCI,DIV IND ENGN & MANAGEMENT,MADRAS 600036,TAMIL NADU,INDIA
来源
MICROELECTRONICS AND RELIABILITY | 1992年 / 32卷 / 09期
关键词
D O I
10.1016/0026-2714(92)90644-Z
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this paper, two preventive maintenance (PM) policies for the bus engines of a transport network have been considered. Based on the mean time to failure (MTTF) data of the engines of a particular make and model, maintenance policies are developed where the failure rate of the engines does not exceed the pre-determined level of maximum failure rate. In policy 1, the system has a different failure distribution (Weibull) between PMs, and in policy II, each PM reduces the effective age of the system. The number of PM interventions and their schedule times, which minimize the expected mean cost rate over an infinite time horizon for both the policies, have been discussed. Finally, numerical illustrations and the effect of cost factors on the number of PM interventions and the expected cost rates have been presented.
引用
收藏
页码:1223 / 1229
页数:7
相关论文
共 50 条