HIGH PRODUCTIVITY OPERATION AT CHIBA NO4 SINTER PLANT

被引:2
|
作者
OBATA, H [1 ]
TAKAHASHI, H [1 ]
NAKAMURA, M [1 ]
NATSUMI, T [1 ]
KOMAMURA, K [1 ]
机构
[1] PHILIPPINE SINTER CORP,MISAMIS,PHILIPPINES
关键词
SINTER YIELD; UNIFORM SINTERING; SYSTEMATIZATION; PERMEABILITY; SCREENING; HEARTH LAYER; PRODUCTIVITY;
D O I
10.2355/isijinternational.31.478
中图分类号
TF [冶金工业];
学科分类号
0806 ;
摘要
To meet the demand for increased production, higher productivity has been carried out based on the following targets at Chiba No. 4 Sinter Plant of Kawasaki Steel Corp.: 1) Maintenance of high bed height operation by ensuring stable permeability in the sinter bed, 2) Cost saving sinter production through improvement of sinter yeild, and 3) Maintenance of low SiO2 operation. The following results were obtained from the implementation of various countermeasures. (1) A highly productive operation of 1.8 t/hm2 without adding any binders. (2) The total amount of return fine has been decreased from 400 - 450 to 260 - 300 kg/t-sinter. (3) Sinter production cost has been decreased and the minimum cost per unit has shifted to a higher output.
引用
收藏
页码:478 / 486
页数:9
相关论文
共 50 条
  • [1] HIGH PRODUCTIVITY OPERATION AT CHIBA NO 4 SINTER PLANT
    OBATA, H
    TAKAHASHI, H
    NAKAMURA, M
    NATSUMI, T
    KOMAMURA, K
    TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1990, 76 (05): : 667 - 674
  • [2] AUTOMATIC OPERATION SYSTEM OF SINTER PLANT IN CHIBA WORKS, KAWASAKI-STEEL-CORP
    SASAKI, Y
    WATANABE, M
    TAKAHASHI, H
    KATO, A
    YASUDA, M
    TRANSACTIONS OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 27 (04) : B91 - B91
  • [3] AUTOMATIC OPERATION SYSTEM OF SINTER PLANT IN CHIBA WORKS, KAWASAKI-STEEL-CORP
    KATO, A
    TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S798 - S798
  • [4] ENERGY SAVING OPERATION IN SINTER PLANT OF CHIBA-WORKS, KAWASAKI-STEEL-CORP
    YASUDA, M
    TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S837 - S837
  • [5] SINTERING TECHNOLOGIES FOR HIGH PRODUCTIVITY AT KAKOGAWA SINTER PLANT
    UENAKA, T
    ITO, R
    SHIBUTA, K
    REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 1987, 84 (11): : 789 - 802
  • [6] ACHIEVEMENT OF HIGH PRODUCTIVITY AT A SEMISTRAND COOLING TYPE SINTER PLANT
    KITAMURA, K
    MIYAKE, T
    YANAGISAWA, K
    ONO, K
    SHOUHO, T
    TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1992, 78 (07): : 1037 - 1044
  • [7] OPERATIONAL STUDY OF HIGH-FEO SINTER PRODUCT AT NO 4 SINTERING PLANT OF CHIBA WORKS, KAWASAKI-STEEL-CORPORATION
    TAKASHIMA, N
    TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (04): : S27 - S27
  • [8] POSCO sinter plant capacity, operation and sinter quality
    Ri, DW
    SEMINAR ON SINTER AND PELLETES 1999, 2000, : 127 - 131
  • [9] Sinter plant operation at Sollac Fos
    Huguet, C
    Louglar, D
    Rigal, C
    SEMINAR ON SINTER AND PELLETES 1999, 2000, : 132 - 138
  • [10] EFFECTS OF BURNT LIME ON SINTER OPERATION AT LOW PRODUCTIVITY
    KOMATSU, S
    TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S60 - S60