共 50 条
- [1] HIGH PRODUCTIVITY OPERATION AT CHIBA NO 4 SINTER PLANT TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1990, 76 (05): : 667 - 674
- [3] AUTOMATIC OPERATION SYSTEM OF SINTER PLANT IN CHIBA WORKS, KAWASAKI-STEEL-CORP TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S798 - S798
- [4] ENERGY SAVING OPERATION IN SINTER PLANT OF CHIBA-WORKS, KAWASAKI-STEEL-CORP TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : S837 - S837
- [5] SINTERING TECHNOLOGIES FOR HIGH PRODUCTIVITY AT KAKOGAWA SINTER PLANT REVUE DE METALLURGIE-CAHIERS D INFORMATIONS TECHNIQUES, 1987, 84 (11): : 789 - 802
- [6] ACHIEVEMENT OF HIGH PRODUCTIVITY AT A SEMISTRAND COOLING TYPE SINTER PLANT TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1992, 78 (07): : 1037 - 1044
- [7] OPERATIONAL STUDY OF HIGH-FEO SINTER PRODUCT AT NO 4 SINTERING PLANT OF CHIBA WORKS, KAWASAKI-STEEL-CORPORATION TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 (04): : S27 - S27
- [8] POSCO sinter plant capacity, operation and sinter quality SEMINAR ON SINTER AND PELLETES 1999, 2000, : 127 - 131
- [10] EFFECTS OF BURNT LIME ON SINTER OPERATION AT LOW PRODUCTIVITY TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S60 - S60