共 50 条
- [42] Scheduling a flow-shop problem with fuzzy processing time ICIC Express Letters, 2015, 9 (02): : 517 - 524
- [43] An Effective DE-EDA for Permutation Flow-shop Scheduling Problem 2016 IEEE CONGRESS ON EVOLUTIONARY COMPUTATION (CEC), 2016, : 2927 - 2934
- [44] The Non-Permutation Flow-Shop scheduling problem: A literature review OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2018, 77 : 143 - 153
- [45] Algorithm performance and problem structure for flow-shop scheduling SIXTEENTH NATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE (AAAI-99)/ELEVENTH INNOVATIVE APPLICATIONS OF ARTIFICIAL INTELLIGENCE (IAAI-99), 1999, : 688 - 695
- [46] A hybrid genetic algorithm for the flow-shop scheduling problem ADVANCES IN APPLIED ARTICIAL INTELLIGENCE, PROCEEDINGS, 2006, 4031 : 218 - 227
- [47] A branch and bound procedure for the reentrant permutation flow-shop scheduling problem The International Journal of Advanced Manufacturing Technology, 2006, 29 : 1186 - 1193
- [48] Hyper-heuristic Q-Learning Algorithm for Flow-Shop Scheduling Problem with Fuzzy Processing Times ADVANCED INTELLIGENT COMPUTING TECHNOLOGY AND APPLICATIONS, ICIC 2023, PT I, 2023, 14086 : 194 - 205