Using Online Simulation Technique for Revenue-Based Value for Money Assessment Model in PPP Project

被引:2
|
作者
Peng, Wei [1 ]
Liu, Honglei [1 ]
机构
[1] Tongji Univ, Sch Econ & Management, Shanghai 200092, Peoples R China
关键词
Public Private Partnerships; Value for Money; Simulation; Decision Support;
D O I
10.3991/ijoe.v9i3.2804
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Infrastructure public private partnerships (PPP) procurement must be carefully selected on the basis of value for money when compared to conventional procurement. While the value for money analysis has been widely used to ensure low procurement cost in PPP, little is known with respect to its effectiveness and data source. The paper explores existing value for money assessment model and reports its deficiencies in ignoring project revenue and network data collecting. Addressing the current issues, a new revenue based value for money assessment model with Monte Carlo simulation technique is proposed. Data used for simulation come from project participants who obtain and share data through an online virtual collaborative platform. By applying this online technique, project data is more easily shared and reused. This data transmission process is automated and seamless. Then, the effectiveness of new model was examined by using a hypothetical toll road case. It shows that the new value for money assessment model demonstrates the significant advantage in estimating the risk, cost, and revenue variance and assisting the public agency to make decision in the procurement phase.
引用
收藏
页码:88 / 92
页数:5
相关论文
共 50 条
  • [21] Comparison of position determination accuracy conducted by PPP technique using web-based online service and dedicated scientific software
    Krzan, Grzegorz
    Dawidowcz, Karol
    Swiatek, Krzysztof
    9TH INTERNATIONAL CONFERENCE ENVIRONMENTAL ENGINEERING (9TH ICEE) - SELECTED PAPERS, 2014,
  • [22] Tropical cyclone hazard assessment using model-based track simulation
    Jonas Rumpf
    Helga Weindl
    Peter Höppe
    Ernst Rauch
    Volker Schmidt
    Natural Hazards, 2009, 48 : 383 - 398
  • [23] Tropical cyclone hazard assessment using model-based track simulation
    Rumpf, Jonas
    Weindl, Helga
    Hoeppe, Peter
    Rauch, Ernst
    Schmidt, Volker
    NATURAL HAZARDS, 2009, 48 (03) : 383 - 398
  • [24] An ANN-based optimization model for facility layout problem using simulation technique
    Azimi, P.
    Soofi, P.
    SCIENTIA IRANICA, 2017, 24 (01) : 364 - 377
  • [25] RELIABILITY-BASED ASSESSMENT OF CRACKED PIPELINES USING MONTE CARLO SIMULATION TECHNIQUE WITH CORLAS™
    Zhang, Xinfang
    Zheng, Qian
    Leung, Juliana
    Adeeb, Samer
    PROCEEDINGS OF ASME 2022 PRESSURE VESSELS AND PIPING CONFERENCE, PVP2022, VOL 2, 2022,
  • [26] Reliability Assessment of Power System using Importance Sampling Technique Based on Layer Optimization Simulation
    Wang, Bin
    COMPUTER-AIDED DESIGN, MANUFACTURING, MODELING AND SIMULATION, PTS 1-2, 2011, 88-89 : 554 - 558
  • [27] An Essay- Based Examination Assessment Model Using Double Blind Marking Technique
    Olufisoye, Akanbi Caleb
    WORLD CONGRESS ON ENGINEERING AND COMPUTER SCIENCE, WCECS 2012, VOL I, 2012, : 189 - 193
  • [28] Correlation Model Between Estimated Project Cost and Net Present Value (NPV) on Transportation Infrastructure Projects Using Public Private Partnership (PPP) Scheme
    Islami, R. C.
    Hazhiyah, A. U.
    2ND INTERNATIONAL CONFERENCE ON SUSTAINABLE INFRASTRUCTURE, 2020, 1625
  • [29] Crack propagation assessment for spur gears using model-based analysis and simulation
    Zhigang Tian
    Ming J. Zuo
    Siyan Wu
    Journal of Intelligent Manufacturing, 2012, 23 : 239 - 253
  • [30] Spur Gear Crack Propagation Assessment Using Model-Based Analysis and Simulation
    Tian, Zhigang
    Zuo, Ming J.
    DAMAGE ASSESSMENT OF STRUCTURES VIII, 2009, 413-414 : 299 - +