WORKPLACE HANDLING-SYSTEM DESIGN TARGETS ON PRODUCTIVITY AS MAIN OBJECTIVE

被引:0
|
作者
LANE, JD
MARIOTTI, JJ
机构
来源
INDUSTRIAL ENGINEERING | 1981年 / 13卷 / 04期
关键词
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
引用
收藏
页码:84 / &
相关论文
共 50 条
  • [41] PLANNING AN INPLANT BULK MATERIAL HANDLING-SYSTEM
    SCHULTZ, GA
    PLANT ENGINEERING, 1979, 33 (08) : 337 - 339
  • [42] THE GAS HANDLING-SYSTEM FOR THE DYNAMITRON TANDEM AT BOCHUM
    BRAND, K
    NUCLEAR INSTRUMENTS & METHODS IN PHYSICS RESEARCH SECTION A-ACCELERATORS SPECTROMETERS DETECTORS AND ASSOCIATED EQUIPMENT, 1988, 268 (2-3): : 437 - 441
  • [43] AN ADVANCED INTEGRATED GC AND DATA HANDLING-SYSTEM
    BANYARD, F
    HENDERSON, SB
    AMERICAN LABORATORY, 1988, 20 (03) : 84 - &
  • [44] FISH - FLEXIBLE INFORMATION SHARING AND HANDLING-SYSTEM
    SEKI, Y
    YAMAKAMI, T
    SHIMIZU, A
    SYSTEMS AND COMPUTERS IN JAPAN, 1994, 25 (10) : 36 - 46
  • [45] EVALUATION OF DISPATCHING RULES IN A ROBOT HANDLING-SYSTEM
    ARCHETTI, F
    SCIOMACHEN, A
    SPERANZA, MG
    IEEE INTERNATIONAL CONFERENCE ON SYSTEMS ENGINEERING ///, 1989, : 251 - 256
  • [46] THROUGHPUT ANALYSIS IN AN AUTOMATED MATERIAL HANDLING-SYSTEM
    PULAT, PS
    PULAT, BM
    SIMULATION, 1989, 52 (05) : 195 - 198
  • [47] A GAS HANDLING-SYSTEM FOR ETHYLENE-OXIDE
    DINARDI, SR
    SACCO, CL
    MCLEANSHINAMAN, C
    AMERICAN INDUSTRIAL HYGIENE ASSOCIATION JOURNAL, 1980, 41 (10): : 766 - 769
  • [48] PLANNING AN INPLANT BULK MATERIAL HANDLING-SYSTEM
    SCHULTZ, GA
    PLANT ENGINEERING, 1979, 33 (06) : 141 - 143
  • [49] Y-AXIS PEN HANDLING-SYSTEM
    HASELBY, RD
    PERACH, DJ
    HAUGH, SR
    HEWLETT-PACKARD JOURNAL, 1981, 32 (11): : 25 - 32
  • [50] DEVELOPMENT OF A SIMULATED AGV MATERIAL HANDLING-SYSTEM
    LWIN, M
    INDUSTRIAL ENGINEERING, 1994, 26 (09): : 48 - 49