THE SCHEDULING OF A BARGE LINE

被引:0
|
作者
OBRIEN, GG
机构
关键词
D O I
暂无
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
引用
收藏
页码:894 / 894
页数:1
相关论文
共 50 条
  • [21] Holonic scheduling for an assembly line
    Cechowicz, R
    SOFT COMPUTING AND INDUSTRY: RECENT APPLICATIONS, 2002, : 103 - 110
  • [22] Periodic flow line scheduling
    McPherson, RF
    White, KP
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1998, 36 (01) : 51 - 73
  • [23] On scheduling of a reentrant line with a hub
    Fu-Jen Catholic Univ, Taipei, Taiwan
    J Chin Soc Mech Eng Trans Chin Inst Eng Ser C, 6 (603-613):
  • [24] COMPUTER SCHEDULING - ON LINE AND ON TIME
    BOLTZ, DH
    MOLINSKI, J
    CIVIL ENGINEERING, 1987, 57 (06): : 56 - 58
  • [25] Scheduling twin robots on a line
    Erdogan, Guenes
    Battarra, Maria
    Laporte, Gilbert
    NAVAL RESEARCH LOGISTICS, 2014, 61 (02) : 119 - 130
  • [26] Scheduling in a continuous galvanizing line
    Valls Verdejo, Vicente
    Perez Alarco, M. Angeles
    Lino Sorli, M. Pilar
    COMPUTERS & OPERATIONS RESEARCH, 2009, 36 (01) : 280 - 296
  • [27] BARGE BUILDING AND BARGE BUILDERS OF THE SWALE - SATTIN,DL
    DARCH, M
    MARINERS MIRROR, 1991, 77 (04): : 453 - 454
  • [28] THIRD-GENERATION LAY BARGE WILL SPEED NORTH SEA LINE WORK.
    Lagers, G.H.G.
    Bell, C.R.
    1600, (72):
  • [29] Chips by barge
    Leggett, D
    PROFESSIONAL ENGINEERING, 2002, 15 (08) : 23 - 23
  • [30] No ''Barge in'' on ''Glargine''!
    Sadikot, S.
    Sosale, A.
    Nigam, A.
    Ahmed, J.
    Singh, S.
    Zargar, A.
    Misra, A.
    PrasannaKumar, K.
    Wangnoo, S.
    Makker, B.
    Bajaj, S.
    Singh, J.
    Dhruv, U.
    Jali, M.
    Sinha, N.
    Sai, K.
    SadasivRao, Y.
    Murthy, S.
    Reddy, A.
    DIABETES & METABOLIC SYNDROME-CLINICAL RESEARCH & REVIEWS, 2009, 3 (03) : 132 - 138