Problems of seepage/leakage in earth and masonry dams - Few case studies

被引:0
|
作者
Rathod, KG [1 ]
Golwala, MG [1 ]
Shah, DA [1 ]
机构
[1] Cent Designs Org, Gujarat, India
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
After the independence, large number of masonry cum earth dams have been constructed in the country and in Gujarat State as well as,. being labour intensive and economically acceptable the composite dam construction has been widely adopted. These darns are in operation for last 30 to 40 years. In these dams, it has always been hard to achieve sufficient impermeability, even though certain preventive measures were taken as a part of original construction. Records of seepage through the body of darn as well as through the foundation for most of the dams are now available for analysis. Of late, few dams have posed the problems of excessive leakage through foundation and the body of dam. darn. Most of the post construction problems have occurred because of unsatisfactory performance of (i) joints within the body of the dam (ii) junction and/or (iii) foundation, resulting in seepage/leakage through these weak features. Seepage/leakage have sometimes been found coupled with appearance of surface cracks causing damages to masonry of different components of dam leading to major problems of sudden and excessive leakage. The junction between earth darn and masonry dam components such as abutment, foundation etc. is the vulnerable link. They are major sources for distress and damage to wrapround and piping along the interface. The main causes are (a) different stress-strain characteristics of adjoining materials and (b) practical difficulties iii achieving cll siren quality standards of workmanship at the junctions. The quality of workmanship is an important aspect for obtaining the required imperviousness of the dam body. It has been noticed that junction problems are more pronounced in minor and medium height projects than in major projects. Detection of actual cause and path of seepage and its remedial measures are found very difficult, time consuming, expensive and less effective if not properly treated.
引用
收藏
页码:415 / 424
页数:10
相关论文
共 50 条
  • [31] Seepage behaviour through earth dams with zones of different filling materials
    Mostafa, Mahmoud M.
    Shen, Zhenzhong
    WATER SA, 2024, 50 (01) : 106 - 120
  • [32] Minimizing of seepage beneath earth fill dams using cutoff wall
    Hassan, A.E.
    AEJ - Alexandria Engineering Journal, 2009, 48 (04): : 457 - 468
  • [33] The Drawdown of a Reservoir: Its Effect on Seepage Conditions and Stability of Earth Dams
    Aniskin, Nikolay
    Stupivtsev, Andrey
    Sergeev, Stanislav
    Bokov, Ilia
    WATER, 2024, 16 (18)
  • [34] Predicting Seepage of Earth Dams Using Neural Network and Genetic Algorithm
    Miao, Xinying
    Chu, Jinkui
    Qiao, Jing
    Zhang, Linghan
    MEMS, NANO AND SMART SYSTEMS, PTS 1-6, 2012, 403-408 : 3081 - 3085
  • [35] Detection Model for Seepage Behavior of Earth Dams Based on Data Mining
    Jiang, Zhenxiang
    He, Jinping
    MATHEMATICAL PROBLEMS IN ENGINEERING, 2018, 2018
  • [36] Effect of zones' dimensions and geometry on seepage through zoned earth dams
    Mostafa M.M.
    Zhenzhong S.
    Journal of Engineering and Applied Science, 2023, 70 (01):
  • [37] Overcladding repairs to water leakage problems: case studies
    ASTM Spec Tech Publ, 1352 (303-316):
  • [38] Overcladding repairs to water leakage problems: Case studies
    Kaskel, BS
    Searls, CL
    WATER PROBLEMS IN BUILDING EXTERIOR WALLS: EVALUATION, PREVENTION, AND REPAIR, 1999, 1352 : 303 - 316
  • [39] Breach mechanism and numerical simulation for seepage failure of earth-rock dams
    CHEN ShengShui 1
    2 State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering
    Science China(Technological Sciences) , 2012, (06) : 1757 - 1764
  • [40] Breach mechanism and numerical simulation for seepage failure of earth-rock dams
    ShengShui Chen
    QiMing Zhong
    Wei Cao
    Science China Technological Sciences, 2012, 55 : 1757 - 1764