共 50 条
- [34] Evaluation criteria for rescheduling plans - Identification of additional expenses as result of rescheduling 1600, VDI Fachmedien GmBH & Co. KG (104):
- [35] Information and other criteria in structural equation model selection Communications in Statistics Part B: Simulation and Computation, 1997, 26 (04): : 1477 - 1516
- [38] Best Value Procurement of Architectural and Engineering Services: Selection Characteristics and the Relative Influence of Various Evaluation Criteria AEI 2017: RESILIENCE OF THE INTEGRATED BUILDING, 2017, : 794 - 805
- [39] A COMPARATIVE ANALYSIS AND EVALUATION OF MODEL SELECTION CRITERIA PROCEEDINGS OF THE ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION, 2017, VOL 5, 2018,