共 50 条
- [42] Some properties of discrete lot sizing and scheduling problem with setup times using integral demand PROCEEDINGS OF THE 2000 IEEE INTERNATIONAL CONFERENCE ON MANAGEMENT OF INNOVATION AND TECHNOLOGY, VOLS 1 AND 2: MANAGEMENT IN THE 21ST CENTURY, 2000, : 859 - 862
- [43] SIMPLE HEURISTIC METHOD FOR LOT SIZING IN A TIME-PHASED REORDER SYSTEM. Production & Inventory Management, 1982, 23 (01): : 15 - 22
- [45] CAVEAT ON USING SETUP COSTS IN LOT-SIZING. Production & Inventory Management, 1984, 25 (01): : 11 - 14
- [49] Equivalence of the LP relaxations of two strong formulations for the capacitated lot-sizing problem with setup times OR Spectrum, 2008, 30 : 773 - 785