PRELIMINARY DESIGN OF CABLE-STAYED FOOTBRIDGE

被引:0
|
作者
Curic, Ivan [1 ]
Nikolic, Marin [1 ]
Draganic, Hrvoje [1 ]
Kraus, Ivan [1 ]
机构
[1] Sveuciliste Josipa Jurja Strossmayera Osijeku, Gradevinski Fak, Osijek, Croatia
来源
ELECTRONIC JOURNAL OF THE FACULTY OF CIVIL ENGINEERING OSIJEK-E-GFOS | 2012年 / 4卷
关键词
EN1990; EN1991-1-1; EN1991-2; eccentric inclined pylon; numerical model; cable-stayed bridge;
D O I
10.13167/2012.4.3
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper presents a preliminary design of a footbridge over the River Drava in Osijek. Width of the water obstacle is 195,0 m. The selected solution is cable-stayed reinforced concrete bridge with an eccentric inclined pylon. Graphical drawings of the bridge were made in AutoCad software package and numerical model in the SAP2000 v14.2 software package. Modal analysis and calculation of the section forces was performed on the basis of selected dimensions of certain parts of the bridge structure, the analysis of variable loads according to EN1991-2 and the appropriate combination of loads according to EN1990.
引用
收藏
页码:24 / 36
页数:13
相关论文
共 50 条
  • [31] Optimum design of cable-stayed bridges
    Long, WY
    Troitsky, MS
    Zielinski, ZA
    STRUCTURAL ENGINEERING AND MECHANICS, 1999, 7 (03) : 241 - 257
  • [32] Stability design of cable-stayed columns
    Tankova, T.
    da Silva, L. Simoes
    Martins, J. P.
    STABILITY AND DUCTILITY OF STEEL STRUCTURES 2019, 2019, : 1120 - 1127
  • [33] Optimum design of cable-stayed bridges
    Yazdani-Paraei, H.
    Moharrami, H.
    Maalek, S.
    Heydari, M.
    AUSTRALIAN JOURNAL OF STRUCTURAL ENGINEERING, 2011, 12 (02) : 99 - 117
  • [34] Optimum design of cable-stayed bridges
    Department of Transportation, Transp. System Information Program, Office of Highway System Engineering, 1120 N Street, MS #38, Sacramento, CA 94273-0001, United States
    不详
    Struct Eng Mech, 3 (241-257):
  • [35] "Ponte del mare": Conceptual design and realization of a long span cable-stayed footbridge in Pescara, Italy
    De Miranda M.
    De Palma A.
    Zanchettin A.
    Structural Engineering International: Journal of the International Association for Bridge and Structural Engineering (IABSE), 2010, 20 (01): : 21 - 25
  • [36] "Ponte Del Mare": Conceptual Design and Realization of a Long Span Cable-Stayed Footbridge in Pescara, Italy
    De Miranda, Mario
    De Palma, Alessandro
    Zanchettin, Alberto
    STRUCTURAL ENGINEERING INTERNATIONAL, 2010, 20 (01) : 21 - 25
  • [37] Determination of proper post-tensioning cable force of cable-stayed footbridge with TLBO algorithm
    Atmaca, Barbaros
    STEEL AND COMPOSITE STRUCTURES, 2021, 40 (06): : 805 - 816
  • [38] Seismic performance of a cable-stayed footbridge using a concrete damage plasticity model
    Drygala, Izabela J.
    Dulinska, Joanna M.
    Wazowski, Marek
    INTERNATIONAL CONFERENCE ON ANALYTICAL MODELS AND NEW CONCEPTS IN CONCRETE AND MASONRY STRUCTURES, 2017, 193 : 525 - 532
  • [39] Estimation of cables' tension of cable-stayed footbridge using measured natural frequencies
    Jakiel, Przemyslaw
    Manko, Zbigniew
    DYNAMICS OF CIVIL ENGINEERING AND TRANSPORT STRUCTURES AND WIND ENGINEERING (DYN-WIND'2017), 2017, 107
  • [40] Dynamic characteristics of a cable-stayed pedestrian and cyclists footbridge 120 m long
    Murzyn, I. J. (imurzyn@pk.edu.pl), 1600, CAFET INNOVA Technical Society, 1-2-18/103, Mohini Mansion, Gagan Mahal Road,, Domalguda, Hyderabad, 500029, India (07):