共 50 条
- [31] SCHEDULE FREE ROLLING OPERATIONS IN HOT STRIP MILL AT YAWATA WORKS, NIPPON-STEEL-CORPORATION .3. DEVELOPMENT OF MILL PACING SYSTEM FOR REVERSIBLE ROUGHING-TRAIN TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S330 - S330
- [33] OUTLINE OF NEW AUTOMATIC GAUGE CONTROL-SYSTEM IN NEW COLD STRIP MILL AT NIPPON-STEELS-YAWATA-WORKS TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1993, 79 (03): : T29 - T32
- [35] NETWORKED ONLINE COMPUTER-SYSTEM FOR EXISTING RAIL AND SECTION MILL AT YAWATA-WORKS, NIPPON-STEEL-CORP TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1984, 70 (13): : 1173 - 1173
- [38] RECONSTRUCTION AND OPERATION OF KIMITSU NO-1 BOF DH EQUIPMENT OF NIPPON-STEEL-CORPORATION TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (12): : 1111 - 1111
- [39] LOW [SI] OPERATION AT MIZUSHIMA WORKS OF KAWASAKI-STEEL-CORPORATION TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1987, 73 (04): : S93 - S93
- [40] CONSTRUCTION AND BLOW IN OF MURORAN NO 2 BLAST-FURNACE OF NIPPON-STEEL-CORPORATION .2. BLOW IN OPERATION AT MURORAN NO 2 BLAST-FURNACE OF NIPPON-STEEL-CORPORATION TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1986, 72 (04): : S7 - S7