OPEN-SHOP MOVEMENT SLITHERS INTO CONSTRUCTION CONTRACTING

被引:0
|
作者
OLSEN, RN
机构
来源
CIVIL ENGINEERING | 1971年 / 41卷 / 11期
关键词
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
引用
收藏
页码:40 / &
相关论文
共 50 条
  • [31] Competitive genetic algorithms for the open-shop scheduling problem
    Christian Prins
    Mathematical Methods of Operations Research, 2000, 52 : 389 - 411
  • [32] Optimal Constraint Programming Approach to the Open-Shop Problem
    Malapert, Arnaud
    Cambazard, Hadrien
    Gueret, Christelle
    Jussien, Narendra
    Langevin, Andre
    Rousseau, Louis-Martin
    INFORMS JOURNAL ON COMPUTING, 2012, 24 (02) : 228 - 244
  • [33] Competitive genetic algorithms for the open-shop scheduling problem
    Prins, C
    MATHEMATICAL METHODS OF OPERATIONS RESEARCH, 2000, 52 (03) : 389 - 411
  • [34] Open-Shop Scheduling for Unit Jobs Under Precedence Constraints
    Zhang, An
    Chen, Yong
    Goebel, Randy
    Lin, Guohui
    COMBINATORIAL OPTIMIZATION AND APPLICATIONS (COCOA 2018), 2018, 11346 : 329 - 340
  • [35] Complexity results for flow-shop and open-shop scheduling problems with transportation delays
    Brucker, P
    Knust, S
    Cheng, TCE
    Shakhlevich, NV
    ANNALS OF OPERATIONS RESEARCH, 2004, 129 (1-4) : 81 - 106
  • [36] A hybrid discrete particle swarm algorithm for open-shop problems
    Yang, Qingyun
    Sun, Jigui
    Zhang, Juyang
    Wang, Chunjie
    SIMULATED EVOLUTION AND LEARNING, PROCEEDINGS, 2006, 4247 : 158 - 165
  • [37] Extended Genetic Algorithm for solving open-shop scheduling problem
    Ali Asghar Rahmani Hosseinabadi
    Javad Vahidi
    Behzad Saemi
    Arun Kumar Sangaiah
    Mohamed Elhoseny
    Soft Computing, 2019, 23 : 5099 - 5116
  • [38] On the open-shop problem with preemption and minimizing the average completion time
    Bräsel, H
    Hennes, H
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2004, 157 (03) : 607 - 619
  • [39] PSO based scheduling algorithm for open-shop scheduling problem
    Department of Industrial and Manufacturing System Engineering, Huazhong University of Science and Technology, Wuhan 430074, China
    Jixie Gongcheng Xuebao, 2006, 2 (129-134):
  • [40] Preemptive Open-shop Scheduling: Network Flow based Algorithm
    Zhan, Y.
    Zhong, Y. G.
    Zhu, H. T.
    DIGITAL DESIGN AND MANUFACTURING TECHNOLOGY II, 2011, 215 : 111 - 114