GA optimization model for solving tower crane location problem in construction sites

被引:42
|
作者
Abdelmegid, Mohammed Adel [1 ]
Shawki, Khaled Mohamed [1 ]
Abdel-Khalek, Hesham [2 ]
机构
[1] Arab Acad Sci Technol & Maritime Transport, Coll Engn & Technol, Construct & Bldg Engn Dept, Cairo, Egypt
[2] Univ Alexandria, Dept Struct Engn, Construct Engn & Management, Fac Engn, Alexandria, Egypt
关键词
Optimization models; Genetic algorithms; Tower crane; Construction site layout;
D O I
10.1016/j.aej.2015.05.011
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Tower crane is increasingly becoming one of the key components of temporary site layout facilities in most construction projects. Determining the location of tower crane is an essential task of layout planning, which is also the central focus of this study. The optimization of tower crane location depends on many interrelated factors, including site constraints, shape and size of the buildings, type and quantity of required materials, crane configurations, crane type, and construction site layout. These factors vary from one project to another, resulting to complicated site layout strategies and approaches. This fact makes the crane location problem impractical to be solved depending on experience of practitioners only which was gained by assuming and through trial and error. This paper aimed at developing an optimization model to solve tower crane location problem in construction sites. The objective was to minimize the total transportation time. Genetic Algorithms (GA) optimization technique is utilized to solve the problem. A numerical example is presented to test and validate the results obtained by the model. (c) 2015 Faculty of Engineering, Alexandria University. Production and hosting by Elsevier B.V.
引用
收藏
页码:519 / 526
页数:8
相关论文
共 50 条
  • [21] OPTIMIZING LOCATION OF TOWER CRANES ON CONSTRUCTION SITES THROUGH GIS AND BIM INTEGRATION
    Irizarry, Javier
    Karan, Ebrahim P.
    JOURNAL OF INFORMATION TECHNOLOGY IN CONSTRUCTION, 2012, 17 : 351 - 366
  • [22] Dynamical modelling of boom tower crane rigging systems: model selection for construction
    Johns, Brandon
    Abdi, Elahe
    Arashpour, Mehrdad
    ARCHIVES OF CIVIL AND MECHANICAL ENGINEERING, 2023, 23 (03)
  • [23] Optimization of Tower Crane Location and Material Quantity Between Supply and Demand Points: A Comparative Study
    Kaveh, Ali
    Vazirinia, Yasin
    PERIODICA POLYTECHNICA-CIVIL ENGINEERING, 2018, 62 (03): : 732 - 745
  • [24] Integrated Location-Routing Problem Modeling and GA Algorithm Solving
    Peng Yong
    INTERNATIONAL CONFERENCE ON INTELLIGENT COMPUTATION TECHNOLOGY AND AUTOMATION, VOL 1, PROCEEDINGS, 2008, : 81 - 84
  • [25] An Estimation of the Safety Risk Factors Encountered During Tower Crane Installation and Dismantling on Construction Sites in Vietnam
    Thanh-Long, Ngo
    INTERNATIONAL JOURNAL OF SUSTAINABLE CONSTRUCTION ENGINEERING AND TECHNOLOGY, 2023, 14 (01): : 337 - 345
  • [26] Priority of Accident Cause Based on Tower Crane Type for the Realization of Sustainable Management at Korean Construction Sites
    Kim, Ju Yong
    Lee, Don Soo
    Kim, Jin Dong
    Kim, Gwang Hee
    SUSTAINABILITY, 2021, 13 (01) : 1 - 15
  • [27] Active BIM Approach to Optimize Work Facilities and Tower Crane Locations on Construction Sites with Repetitive Operations
    Dasovic, Borna
    Galic, Mario
    Klansek, Uros
    BUILDINGS, 2019, 9 (01)
  • [28] Sensor-Based Planning Tool for Tower Crane Anti-Collision Monitoring on Construction Sites
    Sleiman, Jean-Pierre
    Zankoul, Emile
    Khoury, Hiam
    Hamzeh, Farook
    CONSTRUCTION RESEARCH CONGRESS 2016: OLD AND NEW CONSTRUCTION TECHNOLOGIES CONVERGE IN HISTORIC SAN JUAN, 2016, : 2624 - 2632
  • [29] A MODEL FOR CONSTRUCTION PROBLEM SOLVING BY DYNAMIC SOFTWARE
    Bizova-Laleva, Mrs Vania
    MATHEMATICS AND INFORMATICS, 2014, 57 (02): : 188 - 196
  • [30] Bee Colony Optimization Approach to Solving the Anticovering Location Problem
    Dimitrijevic, Branka
    Teodorovic, Dusan
    Simic, Vladimir
    Selmic, Milica
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2012, 26 (06) : 759 - 768