共 31 条
- [11] Monitoring during the construction of the Allen Sewer Tunnel, Toronto, Canada GEOTECHNICAL ASPECTS OF UNDERGROUND CONSTRUCTION IN SOFT GROUND, 1996, : 429 - 434
- [12] The benefits of InSAR monitoring during the construction of the Ceneri Base Tunnel PROCEEDINGS OF THE ITA-AITES WORLD TUNNEL CONGRESS 2023, WTC 2023: Expanding Underground-Knowledge and Passion to Make a Positive Impact on the World, 2023, : 2544 - 2551
- [13] Operation monitoring and risk assessment of earth pressure balance tunnel boring machines in urban environment; high speed tunnel Sants-La Sagrera, in the city of Barcelona, right beside Sagrada Familia Basilica (World Heritage) UNDERGROUND - THE WAY TO THE FUTURE, 2013, : 1320 - 1327
- [14] MONITORING AND ASSESSMENT OF A FRAME TUNNEL BRIDGE DURING JACKING CONSTRUCTION STAGE ADVANCES IN CONCRETE STRUCTURAL DURABILITY, PROCEEDINGS OF ICDCS2008, VOLS 1 AND 2, 2008, : 1051 - 1057
- [15] Risk Management by Means of Geotechnical Monitoring during Kralovska obora Tunnel Construction Transport and City Tunnels - Proceedings of the 11th International Conference Underground Constructions Prague 2010, 2010, : 626 - 630
- [17] The benefits of InSAR monitoring in urban environments during the construction of the Ceneri Base Tunnel GALLERIE E GRANDI OPERE SOTTERRANEE, 2022, (142): : 41 - 50