共 50 条
- [1] ADDITIONAL MECHANIZED PRODUCTION CAPACITY AT WILLIAM LEE MALLEABLE FOUNDRY MACHINERY AND PRODUCTION ENGINEERING, 1972, 121 (3127): : 550 - &
- [2] PROBLEMS OF MECHANIZED PLANT PRODUCTION TO BE SOLVED UP TO 1980 AGRARTECHNIK, 1978, 28 (04): : 143 - 144
- [4] Contactless Control Systems in Foundry Production. Mekhanizatsiya i Avtomatizatsiya Proizvodstva, 1975, (04): : 13 - 15
- [5] Programme of production quality control in foundry practice Litejnoe Proizvodstvo, 1992, (04): : 23 - 25
- [6] PROBLEMS AND SOLUTIONS IN SYSTEMS FOR PRODUCTION CONTROL OF SINGLE BATCH AND SMALL SERIES PRODUCTION WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1979, 69 (06): : 365 - 369
- [9] Distributed Scheduling Practices in a Foundry: Towards Collaborative Production Control TENTH WUHAN INTERNATIONAL CONFERENCE ON E-BUSINESS, VOLS I AND II, 2011, : 1317 - 1324
- [10] OUTLINE REQUIREMENTS FOR A PRODUCTION PLANNING AND CONTROL SYSTEM FOR A FOUNDRY. Foundryman, 1983, 76 (pt 4): : 56 - 59