共 50 条
- [22] SUB-CONTRACTOR SOLVES THE PROBLEM OF MANUFACTURING AN OPTICAL MEASURING INSTRUMENT BY USING PRECISION-MADE PLASTIC PARTS. IPE International, Industrial & Production Engineering, 1985, 9 (01): : 37 - 38
- [26] CONSTRUCTION PRODUCTIVITY IMPROVEMENT - HOW TO GET STARTED CIVIL ENGINEERING, 1981, 51 (08): : 52 - 54