共 50 条
- [43] One-machine, N-product-type, continuous-time scheduling with a common due date: A polynomially solvable case IIE Transactions (Institute of Industrial Engineers), 2001, 33 (01): : 1 - 10
- [49] Single machine batch scheduling with release times and delivery costs Journal of Scheduling, 2013, 16 : 69 - 79