Application of Risk-Informed Methods to In-Service Piping Inspection in Framatome Type Nuclear Power Plants

被引:0
|
作者
Kim, Jin-Hoi [1 ]
Lee, Jeong-Seok [1 ]
Yun, Eun-Sub [1 ]
机构
[1] NDE Engn Grp, KHNP Cent Res Inst, Daejeon 305343, South Korea
关键词
Risk-Informed In-Service Inspection (RI-ISI); Probabilistic Safety Assessment (PSA); Risk Reduction Worth (RRW); Core Damage Frequency (CDF); Large Early Release Frequency (LERF); High Failure Importance (HFI);
D O I
10.7779/JKSNT.2014.34.4.311
中图分类号
TB3 [工程材料学];
学科分类号
0805 ; 080502 ;
摘要
The Pressurized water reactor owners group (PWROG) developed and applied a risk-informed in-service inspection (RI-ISI) program, as an alternative to the existing ASME Section XI' sampling inspection method. The RI-ISI programs enhance overall safety by focusing inspections of piping at high safety significance (HSS) locations where failure mechanisms are likely to be present. Additionally, the RI-ISI program can reduce nondestructive evaluation (NDE) exams, man-rem exposure for inspectors, and inspection time, among other benefits. The RI-ISI method of in-service piping inspection was applied to 3 units (KSNPs: Korea standard nuclear power plants) and is being deployed to the other units. In this paper, the results of RI-ISI for a Framatome type (France CPI) nuclear power plant are presented. It was concluded that application of RI-ISI to the plant could enhance and maintain plant safety, as well as provide the benefits of greater reliability.
引用
收藏
页码:311 / 317
页数:7
相关论文
共 50 条
  • [21] Risk monitor riskangel for risk-informed applications in nuclear power plants
    Wang, Fang
    Wang, Jiaqun
    Wang, Jin
    Li, Yazhou
    Hu, Liqin
    Wu, Yican
    ANNALS OF NUCLEAR ENERGY, 2016, 91 : 142 - 147
  • [22] CANDU OWNERS GROUP RISK-INFORMED IN-SERVICE INSPECTION (RI-ISI) PROJECT
    Lafreniere, Paul
    O'Regan, Patrick
    Rezaie-Manesh, Mehdi
    Chesworth, Scott
    PROCEEDINGS OF THE ASME PRESSURE VESSELS AND PIPING CONFERENCE - 2013, VOL 1A: CODES AND STANDARDS, 2014,
  • [23] Applying risk informed in-service inspection
    Vinod, G
    Kushwaha, HS
    Verma, AK
    Srividya, A
    NUCLEAR ENGINEERING INTERNATIONAL, 2004, 49 (596): : 32 - +
  • [24] Development and application of risk informed in-service inspection analysis procedures
    VTT, Finland
    VTT Tied Valt Tek Tutkimuskeskus, 2006, 2363 (92-102):
  • [25] The application of risk-informed-inservice inspection to recirculation piping welds of a nuclear power plant
    Hsieh, K. C.
    Ting, K.
    Chen, K. T.
    Wu, W. F.
    Lu, Y. L.
    SAFETY AND STRUCTURAL INTEGRITY 2006, 2007, 120 : 213 - +
  • [26] UTILITY REQUIREMENTS FOR IN-SERVICE INSPECTION OF NUCLEAR-POWER PLANTS
    LAUTZENHEISER, CE
    TRANSACTIONS OF THE AMERICAN NUCLEAR SOCIETY, 1978, 28 (JUN): : 125 - 126
  • [27] Development of In-service Inspection techniques for nuclear power plants in India
    Rodriguez, P
    Raj, B
    INTERNATIONAL JOURNAL OF PRESSURE VESSELS AND PIPING, 1997, 73 (01) : 59 - 68
  • [28] APPLICATION OF RISK-INFORMED METHODS TO IMPROVE PLANT OPERATION AT KOZLODUY NUCLEAR POWER PLANT
    Kichev, Emil
    Ivanov, Ivan
    Mancheva, Kaliopa
    Petrov, Yasen
    Vladimirova, Vesselina
    ICONE 17: PROCEEDINGS OF THE 17TH INTERNATIONAL CONFERENCE ON NUCLEAR ENGINEERING, VOL 1, 2009, : 119 - 132
  • [29] IN-SERVICE INSPECTION OF NUCLEAR-PLANTS
    SATTLER, FJ
    FORRER, GR
    PARKER, WO
    METALS ENGINEERING QUARTERLY, 1973, 13 (03): : 57 - 64
  • [30] Proposal for risk-informed safety management in Japanese nuclear power plants
    Irie, T
    Ohtani, M
    Kojima, S
    Aoi, S
    Fleming, KN
    True, DE
    PSAM 5: PROBABILISTIC SAFETY ASSESSMENT AND MANAGEMENT, VOLS 1-4, 2000, (34): : 1513 - 1519