MULTIPLE VARIABLE FACTORS, DEMAND UNCERTAINTY, AND THE COOPERATIVE FIRM

被引:2
|
作者
HAWAWINI, GA
机构
关键词
D O I
10.1016/0165-1765(80)90103-2
中图分类号
F [经济];
学科分类号
02 ;
摘要
引用
收藏
页码:15 / 19
页数:5
相关论文
共 50 条
  • [41] Uncertainty of uncertainty and firm cash holdings*
    Goodell, John W.
    Goyal, Abhinav
    Urquhart, Andrew
    JOURNAL OF FINANCIAL STABILITY, 2021, 56
  • [42] COST-FUNCTIONS FOR A SERVICE FIRM WITH VARIABLE QUALITY AND STOCHASTIC DEMAND - THE CASE OF HOSPITALS
    FRIEDMAN, B
    PAULY, M
    REVIEW OF ECONOMICS AND STATISTICS, 1981, 63 (04) : 620 - 624
  • [43] Forecasting daily tourism demand with multiple factors
    Xu, Shilin
    Liu, Yang
    Jin, Chun
    ANNALS OF TOURISM RESEARCH, 2023, 103
  • [44] Firm Inflation Uncertainty
    Yotzov, Ivan
    Anayi, Lena
    Bloom, Nicholas
    Bunn, Philip
    Mizen, Paul
    Oztuerk, Ozgen
    Thwaites, Gregory
    AEA PAPERS AND PROCEEDINGS, 2023, 113 : 56 - 60
  • [45] Uncertainty and growth of the firm
    Lensink, R
    van Steen, P
    Sterken, E
    SMALL BUSINESS ECONOMICS, 2005, 24 (04) : 381 - 391
  • [46] Uncertainty and Growth of the Firm
    Robert Lensink
    Paul van Steen
    Elmer Sterken
    Small Business Economics, 2005, 24 : 381 - 391
  • [47] UNCERTAINTY AND THE SIZE OF THE FIRM
    SCHWARTZMAN, D
    ECONOMICA, 1963, 30 (119) : 287 - 296
  • [48] Non-cooperative Game Decision for Capacity Evaluation under Output Demand Uncertainty
    Yang, Ting
    Zhang, Dinghua
    Chen, Bing
    Li, Shan
    2011 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2011, : 560 - 564
  • [49] Studying the Variability and Uncertainty Impacts of Variable Generation at Multiple Timescales
    Ela, Erik
    O'Malley, Mark
    IEEE TRANSACTIONS ON POWER SYSTEMS, 2012, 27 (03) : 1324 - 1333
  • [50] Variable structure control for systems with mismatched uncertainty and multiple delays
    Hou, Xiao-Li
    Xu, Bu-Gong
    Dianji yu Kongzhi Xuebao/Electric Machines and Control, 2007, 11 (04): : 384 - 387