Evaporation from Camargos hydropower plant reservoir: water footprint characterization

被引:9
|
作者
Bueno, Eduardo de Oliveira [1 ]
de Mello, Carlos Rogerio [1 ]
Alves, Geovane Junqueira [1 ]
机构
[1] Univ Fed Lavras, Lavras, MG, Brazil
来源
关键词
Evaporation; Hydroelectric; Water footprint;
D O I
10.1590/2318-0331.011616021
中图分类号
TV21 [水资源调查与水利规划];
学科分类号
081501 ;
摘要
In recent years, a relevant debate has been raised by a question related to if the hydropower plants indeed represent a non-consumptive use of water resources. In this context, this work was developed at the Camargos Hydropower Plant reservoir, Grande river basin, southern Minas Gerais state, aiming to estimate evaporation rates, which allow the characterization of the Water Footprint in this facility, between the years of 2010 and 2014. Evaporation rates were estimated based on Linacre, Penman and Penman-Monteith methods. Regarding the distribution of evaporation throughout the year, all methods showed the same seasonal pattern, consistent with the meteorological elements behavior that influence this physical process. Although an annual average evaporation considered normal for the studied region (1329 mm) and a small reservoir area (64 km(2)), this hydropower plant has presented low electric energy production as it is an old facility (more than 50 years) and has low installed capacity. Therefore, Camargos Hydropower Plant has presented, by all methods, a high Water Footprint (130 m(3).GJ(-1) on average) compared to estimates for other hydropower plants in Brazil and worldwide.
引用
收藏
页数:6
相关论文
共 50 条
  • [41] The implications of future climate change on the blue water footprint of hydropower in the contiguous US*
    Zhao, Gang
    Gao, Huilin
    Kao, Shih-Chieh
    ENVIRONMENTAL RESEARCH LETTERS, 2021, 16 (03)
  • [42] Simulation and cost model for cooling the water flow from evaporation plant
    Timo, S
    Ari, G
    1996 ICHEME RESEARCH EVENT - SECOND EUROPEAN CONFERENCE FOR YOUNG RESEARCHERS IN CHEMICAL ENGINEERING, VOLS 1 AND 2, 1996, : 675 - 677
  • [43] Project Hydropower Plant "Iller Au" - An Ecological Compatible Hydropower Plant with Dynamic Regulation of Operation Water Level
    Fessler, Walter
    Wiegand, Volker
    Brennauer, Bernd
    Schuchert, Michael
    WASSERWIRTSCHAFT, 2016, 106 (2-3) : 55 - 61
  • [44] Comparison of methods for estimating loss from water storage by evaporation and impacts on reservoir management
    Bozorgi, Atiyeh
    Bozorg-Haddad, Omid
    Sima, Somayeh
    Loaiciga, Hugo A.
    WATER AND ENVIRONMENT JOURNAL, 2021, 35 (01) : 218 - 228
  • [45] THE EFFECT OF A HORIZONTAL MIXING IN THE DIRECTION OF THE WIND UPON EVAPORATION FROM A BOUNDED WATER RESERVOIR
    GANDIN, LS
    SOLOVEICHIK, RE
    DOKLADY AKADEMII NAUK SSSR, 1959, 126 (01): : 59 - 62
  • [46] Impact of filling period of the grand Ethiopian renaissance dam on hydropower generation and hydropower water footprint of Aswan high dam
    El Baradei, Sherine Ahmed
    Abdelkader, Sarah Ehab
    Hussein, Nahla Hazem
    INNOVATIVE INFRASTRUCTURE SOLUTIONS, 2022, 7 (05)
  • [47] Impact of filling period of the grand Ethiopian renaissance dam on hydropower generation and hydropower water footprint of Aswan high dam
    Sherine Ahmed El Baradei
    Sarah Ehab Abdelkader
    Nahla Hazem Hussein
    Innovative Infrastructure Solutions, 2022, 7
  • [48] Global dataset combining open-source hydropower plant and reservoir data
    Jignesh Shah
    Jing Hu
    Oreane Y. Edelenbosch
    Michelle T. H. van Vliet
    Scientific Data, 12 (1)
  • [49] Optimizing Water Resources Allocation and Hydropower Generation for Supporting Reservoir Management
    Zhou, Y. X.
    Huang, G. H.
    Li, Y. P.
    2021 INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE AND BLOCKCHAIN TECHNOLOGY (AIBT 2021), 2021, : 64 - 69
  • [50] WATER-LEVEL CONTROL IN HYDROPOWER PLANT - CLOSURE
    JIMENEZ, OF
    CHAUDHRY, MH
    JOURNAL OF ENERGY ENGINEERING-ASCE, 1994, 120 (02): : 100 - 101