共 50 条
- [24] Solving the economic lot scheduling problem with multiple facilities in parallel using the time-varying lot sizes approach JOURNAL OF INFORMATION & OPTIMIZATION SCIENCES, 2010, 31 (04): : 809 - 835
- [27] ECONOMIC YIELD OF SWIVEL BASE PLATES IN SMALL AND MEDIUM-SIZED LOT SIZES WERKSTATTSTECHNIK ZEITSCHRIFT FUR INDUSTRIELLE FERTIGUNG, 1973, 63 (08): : 458 - 463