Quantitative analysis of the impact of craft worker availability on construction project safety performance

被引:31
|
作者
Karimi, Hossein [1 ]
Taylor, Timothy R. B. [1 ]
Goodrum, Paul M. [2 ]
Srinivasan, Cidambi [3 ]
机构
[1] Univ Kentucky, Dept Civil Engn, Lexington, KY 40506 USA
[2] Univ Colorado, Dept Civil Environm & Architectural Engn, Boulder, CO 80309 USA
[3] Univ Kentucky, Dept Stat, Lexington, KY USA
来源
CONSTRUCTION INNOVATION-ENGLAND | 2016年 / 16卷 / 03期
关键词
Safety; Risk assessment; Construction incidents; Craft worker shortage; Poisson regression analysis; Statistical model;
D O I
10.1108/CI-10-2015-0050
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Purpose - This paper aims to quantify the impact of craft worker shortage on construction project safety performance. Design/methodology/approach - A database of 50 North American construction projects completed between 2001 and 2014 was compiled by taking information from a research project survey and the Construction Industry Institute Benchmarking and Metrics Database. The t-test and Mann-Whitney test were used to determine whether there was a significant difference in construction project safety performance on projects with craft worker recruiting difficulty. Poisson regression analysis was then used to examine the relationship between craft worker recruiting difficulty and Occupational Safety and Health Administration Total Number of Recordable Incident Cases per 200,000 Actual Direct Work Hours (TRIR) on construction projects. Findings - The result showed that the TRIR distribution of a group of projects that reported craft worker recruiting difficulty tended to be higher than the TRIR distribution of a group of projects with no craft worker recruiting difficulty (p-value = 0.004). Moreover, the average TRIR of the projects that reported craft worker recruiting difficulty was more than two times the average TRIR of projects that experienced no craft recruiting difficulty (p-value = 0.035). Furthermore, the Poisson regression analysis demonstrated that there was a positive exponential relationship between craft worker recruiting difficulty and TRIR in construction projects (p-value = 0.004). Research limitations/implications - The projects used to construct the database are heavily weighted towards industrial construction. Practical implications - There have been significant long-term gains in construction safety within the USA. However, if recent craft shortages continue, the quantitative analyses presented herein indicate a strong possibility that more safety incidents will occur unless the shortages are reversed. Innovative construction means and methods should be developed and adopted to work in a safe manner with a less qualified workforce. Originality/value - The Poisson regression model is the first model that quantifiably links project craft worker availability to construction project safety performance.
引用
收藏
页码:307 / 322
页数:16
相关论文
共 50 条
  • [41] Synergistic Effect of Integrated Project Delivery, Lean Construction, and Building Information Modeling on Project Performance Measures: A Quantitative and Qualitative Analysis
    Phuong Nguyen
    Akhavian, Reza
    ADVANCES IN CIVIL ENGINEERING, 2019, 2019
  • [42] Impact of proactive behaviour antecedents on construction project managers' performance
    Kapogiannis, Georgios
    Fernando, Terence
    Alkhard, Ahmed Mohammed
    CONSTRUCTION INNOVATION-ENGLAND, 2021, 21 (04): : 708 - 722
  • [43] Identification of knowledge assets in construction projects and their impact on project performance
    Singla, Harish Kumar
    Shrivas, Abhishek
    Sharma, Ashu
    JOURNAL OF INTELLECTUAL CAPITAL, 2022, 23 (03) : 558 - 587
  • [44] Safety Activity Analysis Framework to Evaluate Safety Performance in Construction
    Awolusi, Ibukun G.
    Marks, Eric D.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (03)
  • [45] A critical analysis of safety performance indicators in construction
    Shaikh, Aziz Yousif
    Osei-Kyei, Robert
    Hardie, Mary
    INTERNATIONAL JOURNAL OF BUILDING PATHOLOGY AND ADAPTATION, 2021, 39 (03) : 547 - 580
  • [46] Exploring the Quantitative Impact of Localization Accuracy on Localization-Based Safety Monitoring's Performance on a Construction Jobsite
    Chen, Hainan
    Luo, Xiaowei
    JOURNAL OF COMPUTING IN CIVIL ENGINEERING, 2019, 33 (06)
  • [47] A Quantitative Study on Construction Job Safety Analysis and Occupational Safety and Health Management
    Priya, M. G. Soundarya
    Anandh, K. S.
    Prasanna, K.
    ADVANCES IN CONSTRUCTION MANAGEMENT, ACMM 2021, 2022, 191 : 355 - 368
  • [48] The analysis of supply chain performance measurement at construction project
    Wibowo, M. Agung
    Sholeh, Moh Nur
    CIVIL ENGINEERING INNOVATION FOR A SUSTAINABLE, 2015, 125 : 25 - 31
  • [49] Safety incentive and penalty provisions in Indian construction projects and their impact on safety performance
    Hasan, Abid
    Jha, Kumar Neeraj
    INTERNATIONAL JOURNAL OF INJURY CONTROL AND SAFETY PROMOTION, 2013, 20 (01) : 3 - 12
  • [50] Framework for Measuring Corporate Safety Culture and Its Impact on Construction Safety Performance
    Molenaar, Keith R.
    Park, Jeong-Il
    Washington, Simon
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT-ASCE, 2009, 135 (06): : 488 - 496