共 50 条
- [41] ON THE STOCHASTIC-BEHAVIOR OF A ONE-SERVER N-UNIT SYSTEM SUBJECT TO RANDOM INSPECTION MICROELECTRONICS AND RELIABILITY, 1985, 25 (04): : 625 - 629
- [42] Reliability analysis of the repair facility for an N-unit series system with an unreliable repair facility and multiple vacations ICIC Express Letters, 2011, 5 (07): : 2377 - 2384
- [43] OPTIMUM PREVENTIVE MAINTENANCE POLICIES FOR A 2-UNIT REDUNDANT SYSTEM WITH REPAIR AND POST-REPAIR MICROELECTRONICS AND RELIABILITY, 1980, 20 (06): : 887 - 890
- [44] PROFIT ANALYSIS OF A 2-UNIT STANDBY SYSTEM WITH 2 TYPES OF REPAIR AND PREVENTIVE MAINTENANCE MICROELECTRONICS AND RELIABILITY, 1986, 26 (03): : 435 - 441
- [45] S-EXPECTED BUSY PERIOD OF THE SERVICE FACILITY OF A L-SERVER N-UNIT SYSTEM SUBJECT TO ARBITRARY FAILURE AND DIFFERENT REPAIR STRATEGIES MICROELECTRONICS AND RELIABILITY, 1982, 22 (03): : 471 - 481
- [48] ON THE STOCHASTIC-BEHAVIOR OF A 1-SERVER 2-UNIT SYSTEM SUBJECT TO ARBITRARY FAILURE, RANDOM INSPECTION AND 2 FAILURE MODES MICROELECTRONICS AND RELIABILITY, 1984, 24 (03): : 375 - 378
- [50] A 3-UNIT STANDBY REDUNDANT SYSTEM WITH REPAIR AND PREVENTIVE MAINTENANCE MICROELECTRONICS AND RELIABILITY, 1990, 30 (02): : 313 - 325