Parasitic Battery Drain Problems and AUTOSAR Acceptance Testing

被引:0
|
作者
Thiyagaraj, Anandan [1 ]
机构
[1] Visteon Tech & Serv Ctr, Chennai, India
关键词
AUTOSAR; Acceptance Testing; Configuration based NM Testing; Sleep/ Wake-up performance; ECU state manager (ECUm);
D O I
10.4271/07-11-02-0013
中图分类号
U [交通运输];
学科分类号
08 ; 0823 ;
摘要
Battery Drain problems can occur in the vehicle due to improper network management between electronic control units (ECUs). Aim of this article is to identify the factors that cause transmission and cease of transmission of a network management message of an ECU along with its application messages that controls the sleep/wake-up performance of other ECUs in the network. Strategy used here is, based on the root cause analysis of problems found in Display unit in vehicle environment, the functional CAN signals impacting sleep/wake-up behavior is re-mapped along with the state flow transition of AUTOSAR NM Algorithm. A re-defined test case design and simulation for vehicle model is created. Especially it focuses on validating the impact of functional CAN signals on DUT's sleep/wake-up performance. The result includes, design and development of use case matrix(mapped with specification) to validate the impact of network management messages, its flow of transition as well as the impact of functional CAN messages on the sleep/wake-up behavior of DUT and on the system as a whole. Also a new set of system level defects identified across Audio and display units-based on the re-designed network management test procedure and simulation with Vector Canoe model (comprehensive software tool for development, test and analysis of entire ECU networks and individual ECUs.). This article provides relevant design guidelines for acceptance testing of any communicative network that follows AUTOSAR standard and this can be deployed across programs/products. It concludes validation of network management functionality (AUTOSAR) shall not be restricted only to the transmission of network management (NM) message of an ECU, as well as shall consider application messages that triggers NM messages of other ECUs in the network.
引用
收藏
页码:139 / 147
页数:9
相关论文
共 50 条
  • [41] LOW-COST CLOCK TIMES BATTERY DRAIN
    SHERMAN, L
    EDN, 1993, 38 (10) : 148 - 148
  • [42] ANALYTICAL SOLUTIONS OF SAND DRAIN PROBLEMS
    BASAK, P
    MADHAV, MR
    JOURNAL OF THE GEOTECHNICAL ENGINEERING DIVISION-ASCE, 1978, 104 (01): : 129 - 135
  • [43] REDUCTION OF BRAIN DRAIN - PROBLEMS AND POLICIES
    MUIR, JD
    MINERVA, 1969, 7 (03) : 494 - 498
  • [44] REDUCTION OF BRAIN DRAIN - PROBLEMS AND POLICIES
    THOMAS, B
    MINERVA, 1969, 7 (1-2) : 92 - 94
  • [45] REDUCTION OF BRAIN DRAIN - PROBLEMS AND POLICIES
    FRIBORG, G
    MINERVA, 1969, 7 (04) : 760 - 761
  • [46] PROBLEMS OF SEEPAGE TO EMPTY DITCH AND DRAIN
    ILYINSKY, NB
    KACIMOV, AR
    WATER RESOURCES RESEARCH, 1992, 28 (03) : 871 - 877
  • [47] Diagnostic problems with parasitic and non-parasitic splenic cysts
    Adas, Gokhan
    Karatepe, Oguzhan
    Altiok, Merih
    Battal, Muharrem
    Bender, Omer
    Ozcan, Deniz
    Karahan, Servet
    BMC SURGERY, 2009, 9
  • [48] Diagnostic problems with parasitic and non-parasitic splenic cysts
    Gokhan Adas
    Oguzhan Karatepe
    Merih Altiok
    Muharrem Battal
    Omer Bender
    Deniz Ozcan
    Servet Karahan
    BMC Surgery, 9
  • [49] ACCEPTANCE TESTING CIRCULATION SOFTWARE
    SEAMAN, S
    LIBRARY SOFTWARE REVIEW, 1993, 12 (04): : 21 - 26
  • [50] ACCEPTANCE TESTING AND SURVEILLANCE OF PLANT
    GREIN, W
    BRAUBACH, HO
    CHEMIE INGENIEUR TECHNIK, 1980, 52 (08) : 639 - 642