DEALING WITH UNCERTAINTIES IN NUCLEAR SAFETY ANALYSES - PART II (DETERMINISTIC APPROACH)

被引:0
|
作者
Apostol, Minodora [1 ]
Leca, Aureliu [2 ]
Constantin, Marin [3 ]
Prisecaru, Ilie [4 ]
机构
[1] Univ Politehn Bucuresti, Inst Nucl Res Pitesti, Bucharest, Romania
[2] Univ Politehn Bucuresti, UNESCO Chair Engn Sci, Bucharest, Romania
[3] Inst Nucl Res Pitesti, Pitesti, Romania
[4] Univ Politehn Bucuresti, Power Engn Fac, Bucharest, Romania
关键词
severe accidents; fission products; Monte Carlo; uncertainty analysis;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
The paper is structured in two parts: (I) uncertainties treatment for probabilistic approach; (II) uncertainties treatment for deterministic approach. Part I presented the contribution of the authors to the development of the methodology for uncertainty analysis in probabilistic safety assessments calculations. Part II presents some original contributions for the uncertainties estimations and their influences in final results for a deterministic approach. A very complex situation is chosen: fission products transport in CANDU primary circuit during a severe accident. For the most sensitive parameters, credible domains of variations were selected and values of the parameters respecting postulated distributions. An analysis of the influences of these parameters in the most important output results is performed.
引用
收藏
页码:319 / 338
页数:20
相关论文
共 50 条
  • [31] Quantitative deterministic versus probability analyses based on a safety margin criterion
    CHEN ZuYu
    CHEN LiHong
    XU JiaCheng
    SUN Ping
    WU Chao
    WANG YuJie
    Science China(Technological Sciences), 2014, (10) : 1988 - 2000
  • [32] COMPREHENSIVE ANALYSES OF NUCLEAR SAFETY SYSTEM CODES
    Roth, Glenn A.
    Aydogan, Fatih
    PROCEEDINGS OF THE ASME INTERNATIONAL MECHANICAL ENGINEERING CONGRESS AND EXPOSITION, 2013, VOL 6B, 2014,
  • [33] Node configuration uncertainty in nuclear safety analyses
    Lee, Jae Jun
    Kim, Min-Gil
    Lee, Jeong Ik
    NUCLEAR ENGINEERING AND DESIGN, 2019, 355
  • [34] Deterministic safety study of advanced molten salt nuclear systems for prospective nuclear power
    Slessarev, I
    Bokov, P
    NUCLEAR ENGINEERING AND DESIGN, 2004, 231 (01) : 67 - 88
  • [35] Deterministic and risk-informed approaches for safety analysis of advanced reactors: Part II, Risk-informed approaches
    Kim, Inn Seock
    Ahn, Sang Kyu
    Oh, Kyu Myung
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2010, 95 (05) : 459 - 468
  • [36] A Polynomial Chaos Approach for Nuclear Data Uncertainties Evaluations
    Dossantos-Uzarralde, P. J.
    Guittet, A.
    NUCLEAR DATA SHEETS, 2008, 109 (12) : 2894 - 2899
  • [37] NBDE Part II Practice Analyses: An Overview
    Tsai, Tsung-Hsun
    Kramer, Gene A.
    Yang, Chien-Lin
    Neumann, Laura M.
    Chang, Shu-Ren
    JOURNAL OF DENTAL EDUCATION, 2013, 77 (12) : 1566 - 1580
  • [38] Advanced BWR criticality safety part II: Cask criticality, burnup credit, sensitivity, and uncertainty analyses
    Price, Dean
    Radaideh, Majdi, I
    O'Grady, Daniel
    Kozlowski, Tomasz
    PROGRESS IN NUCLEAR ENERGY, 2019, 115 : 126 - 139
  • [39] Deterministic and risk-informed approaches for safety analysis of advanced reactors: Part I, deterministic approaches
    Ahn, Sang Kyu
    Kim, Inn Seock
    Oh, Kyu Myung
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2010, 95 (05) : 451 - 458
  • [40] DETERMINISTIC LEAK-BEFORE-BREAK TREATMENT OF UNCERTAINTIES: PART 2-EXAMPLE APPLICATION
    Kozluk, M. J.
    Al-Dojayli, M.
    Pavia, R.
    Mileta, E.
    PROCEEDINGS OF ASME 2023 PRESSURE VESSELS & PIPING CONFERENCE, PVP2023, VOL 6, 2023,