CROSS-PARTY COLLABORATION TO REDUCE CONSTRUCTION WASTE TO DESIGN-BUILD PROJECTS

被引:1
|
作者
Nursin, Afrizal [1 ]
Latif, Yusuf [1 ]
Mochtar, Krishna [2 ]
Soeparto, Hari G. [1 ]
机构
[1] Univ Indonesia, Fac Engn, Dept Civil Engn, Kampus UI Depok, Depok 15424, Indonesia
[2] Indonesian Technol Inst, Civil Engn Study Program, Kampus Inst Teknol Indonesia, Tangerang Selatan 15314, Banten, Indonesia
关键词
Collaboration; Conflict; Construction waste; Design-build;
D O I
10.14716/ijtech.v9i4.1819
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Waste in the construction industry is a severe problem in various countries in the world, including in Indonesia. Several studies on construction projects over the last three years have found that the Construction Waste (CW) tendency has increased significantly. The objective of this study is to identify existing CW in design-build project and how it can be reduced by increasing collaboration between the stakeholders involved in such projects. The survey method is used to explore and find solutions to the CW problems, and to reduce it by increasing collaboration. Data were obtained from 127 respondents working on a design-build construction project, then processed by using the SEM-PLS 3.0 Professional program to estimate the causal-predictive relationships between stakeholder, culture, communication, conflict, and the collaborative variables that affect the reduction in construction waste on design-build project. A collaborative model between the parties implemented by managing those involved, understanding the culture, minimizing conflict and improving communication, can reduce both physical waste and non-physical construction waste.
引用
收藏
页码:751 / 765
页数:15
相关论文
共 50 条
  • [21] Root Causes of Design-Construction Interface Problems in Iranian Design-Build Projects
    Yeganeh, Azadeh A.
    Azizi, Mojtaba
    Falsafi, Reza
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2019, 145 (12)
  • [22] Women and Representation: Cross-Party Collaboration in the Australian Federal Parliament
    Lausberg, A. K.
    PARLIAMENTARY AFFAIRS, 2016, 69 (02) : 249 - 268
  • [23] Risk Management in Engineering and Construction A Case Study in Design-Build Projects in Vietnam
    Phong Thanh Nguyen
    Phu-Cuong Nguyen
    ENGINEERING TECHNOLOGY & APPLIED SCIENCE RESEARCH, 2020, 10 (01) : 5237 - 5241
  • [24] Predicting performance of design-build and design-bid-build projects
    Ling, FYY
    Chan, SL
    Chong, E
    Ee, LP
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2004, 130 (01) : 75 - 83
  • [25] Key Drivers for Adopting Design-Build in Public Construction Projects: Malaysian Perspective
    Lee, Zheng Ping
    Rahman, Rahimi A.
    Doh, Shu Ing
    JOURNAL OF CONSTRUCTION IN DEVELOPING COUNTRIES, 2021, 26 (01) : 131 - 160
  • [26] The Research on Design-Build General Contracting Model of Colleges and Universities Construction Projects
    Chen, Xi
    Liu, Yisheng
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 613 - 616
  • [28] Comparing procurement methods for design-build projects
    El Wardani, MA
    Messner, JI
    Horman, MJ
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2006, 132 (03) : 230 - 238
  • [29] Impact of Design Risk on the Performance of Design-Build Projects
    Liu, Junying
    Xie, Qunxia
    Xia, Bo
    Bridge, Adrian J.
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (06)
  • [30] Risk allocation in design-build and BOT projects
    Nielsen, KR
    CIVIL ENGINEERING IN THE ASIA REGION: ASIAN INFRASTRUCTURE, SUSTAINABLE DEVELOPMENT AND PROJECT MANAGEMENT, 1998, : 37 - 53