DG Planning with Amalgamation of Operational and Reliability Considerations

被引:13
|
作者
Battu, Neelakanteshwar Rao [1 ]
Abhyankar, A. R. [1 ]
Senroy, Nilanjan [1 ]
机构
[1] Indian Inst Technol Delhi, Dept Elect Engn, New Delhi, India
关键词
distributed generation; distribution system; reliability; energy not supplied; performance index; wind turbine generator;
D O I
10.1515/ijeeps-2015-0142
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Distributed Generation has been playing a vital role in dealing issues related to distribution systems. This paper presents an approach which provides policy maker with a set of solutions for DG placement to optimize reliability and real power loss of the system. Optimal location of a Distributed Generator is evaluated based on performance indices derived for reliability index and real power loss. The proposed approach is applied on a 15-bus radial distribution system and a 18-bus radial distribution system with conventional and wind distributed generators individually.
引用
收藏
页码:131 / 141
页数:11
相关论文
共 50 条