ALGORITHMS FOR REAL-TIME SCHEDULING OF JOBS ON MIXED-MODEL ASSEMBLY LINES

被引:30
|
作者
BOLAT, A [1 ]
SAVSAR, M [1 ]
ALFAWZAN, MA [1 ]
机构
[1] KING FAHAD UNIV PETR & MINERALS,DEPT SYST ENGN,DHAHRAN,SAUDI ARABIA
关键词
Algorithms - Computational methods - Heuristic programming - Job analysis - Mathematical models - Operations research - Production control - Real time systems;
D O I
10.1016/0305-0548(94)90098-1
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
The problem of how to sequence jobs with options on a mixed model assembly line without work-in-process storage has been well addressed in the literature. In almost all of the previously developed models, the common goal has been to generate schedules that would maximize the utilization of station capacities. However, the problem of setups and utility work, which is the uncompleted work on a job leaving the station, has not been studied in detail. In this paper, a generalized formulation of the sequencing problem is presented. A Branch and Bound procedure and two heuristic algorithms are developed to determine a sequence which minimizes total setup and utility work costs simultaneously. The Branch and Bound algorithm is restricted to small size problems, while the heuristics can be used to obtain a solution for any realistic problem within a very small amount of computation time. The algorithms are tested on real data and shown to be applicable to real-time scheduling of jobs on mixed model assembly lines.
引用
收藏
页码:487 / 498
页数:12
相关论文
共 50 条
  • [21] A parametric procedure for multicriterion sequence scheduling for Just-In-Time mixed-model assembly lines
    Aigbedo, H
    Monden, Y
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 1997, 35 (09) : 2543 - 2564
  • [22] Master production scheduling and sequencing at mixed-model assembly lines in the automotive industry
    Jan Dörmer
    Hans-Otto Günther
    Rico Gujjula
    Flexible Services and Manufacturing Journal, 2015, 27 : 1 - 29
  • [23] Master production scheduling and sequencing at mixed-model assembly lines in the automotive industry
    Doermer, Jan
    Guenther, Hans-Otto
    Gujjula, Rico
    FLEXIBLE SERVICES AND MANUFACTURING JOURNAL, 2015, 27 (01) : 1 - 29
  • [24] Balancing and cyclical scheduling of asynchronous mixed-model assembly lines with parallel stations
    Lopes, Thiago Cantos
    Michels, Adalberto Sato
    Stall Sikora, Celso Gustavo
    Magatao, Leandro
    JOURNAL OF MANUFACTURING SYSTEMS, 2019, 50 : 193 - 200
  • [25] Local order scheduling for mixed-model assembly lines in the aircraft manufacturing industry
    Buergin J.
    Helming S.
    Andreas J.
    Blaettchen P.
    Schweizer Y.
    Bitte F.
    Haefner B.
    Lanza G.
    Production Engineering, 2018, 12 (6) : 759 - 767
  • [26] Bicriteria sequencing for just-in-time mixed-model assembly lines
    Zeramdini, W
    Aigbedo, H
    Monden, Y
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2000, 38 (15) : 3451 - 3470
  • [27] SEQUENCING JIT MIXED-MODEL ASSEMBLY LINES
    INMAN, RR
    BULFIN, RL
    MANAGEMENT SCIENCE, 1991, 37 (07) : 901 - 904
  • [28] Dynamic resequencing at mixed-model assembly lines
    Franz, Christian
    Koberstein, Achim
    Suhl, Leena
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (11) : 3433 - 3447
  • [29] Approximation algorithms for scheduling real-time jobs with multiple feasible intervals
    Chen, Jian-Jia
    Wu, Jun
    Shih, Chi-Sheng
    REAL-TIME SYSTEMS, 2006, 34 (03) : 155 - 172
  • [30] Approximation algorithms for scheduling real-time jobs with multiple feasible intervals
    Jian-Jia Chen
    Jun Wu
    Chi-Sheng Shih
    Real-Time Systems, 2006, 34 : 155 - 172