共 50 条
- [42] BLAST-FURNACE OPERATION WITH HOT BLAST CONTROL VALVES 48TH IRONMAKING CONFERENCE PROCEEDINGS, 1989, 48 : 565 - 572
- [43] TECHNOLOGICAL ASPECTS OF USING NATURAL-GAS IN BLAST-FURNACE OPERATION STEEL IN THE USSR, 1981, 11 (04): : 195 - 198
- [44] BLAST-FURNACE OPERATION WITH CYCLIC NATURAL-GAS INJECTION REGIME STEEL IN THE USSR, 1986, 16 (04): : 163 - 166
- [45] GAS-DISTRIBUTION CONTROL IN LOW PRODUCTIVITY OPERATION OF BLAST-FURNACE TETSU TO HAGANE-JOURNAL OF THE IRON AND STEEL INSTITUTE OF JAPAN, 1985, 71 : S837 - S837
- [48] System for cleaning blast-furnace gas in the blast-furnace shop at the VSZh Koshitse combine Metallurgist, 2006, 50 : 379 - 383
- [49] THEORETICAL ASSESSMENT OF CHANGE IN TECHNICAL AND ECONOMIC INDEXES OF BLAST-FURNACE OPERATION WITH INJECTION OF REDUCING GAS INTO LOWER PART OF BLAST-FURNACE STACK STEEL IN THE USSR, 1986, 16 (06): : 264 - 265