An Approach to Locate an In Pit Crusher in Open Pit Mines

被引:23
|
作者
Rahmanpour, M. [1 ]
Osanloo, M. [1 ]
Adibee, N. [1 ]
AkbarpourShirazi, M. [2 ]
机构
[1] Amirkabir Univ Technol, Dept Min & Met Engn, Tehran, Iran
[2] Amirkabir Univ Technol, Dept Ind Engn & Management Sci, Tehran, Iran
来源
INTERNATIONAL JOURNAL OF ENGINEERING | 2014年 / 27卷 / 09期
关键词
Open Pit Mining; In Pit Crushing and Conveying; Hub Location Problem;
D O I
10.5829/idosi.ije.2014.27.09c.18
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Haulage costs accounts for 45 to 60% of the total operating costs in large open pit mines. Cost efficiency and high reliability of semi mobile or combined "In Pit Crushing-Conveying (IPCC) and truck" systems compared to conventional truck-shovel systems alone, makes it more appealing to be utilized in modern mining activities. Semi mobile systems have the advantages of both systems, and its operating costs depend on the location of the in pit crushing unit. In this paper, the effective factors on determination of a suitable location of an IPCC are studied and it is investigated as a single hub location problem. The main concerns of the optimum location are minimizing haulage costs and choosing a location regarding the environmental concerns. The method is applied in Sarcheshmeh Copper Mine (SCM), and according to the results, locations C1 to C4 are candidate locations, and applying the hub model, location C2 on level 2450 is suggested to locate the IPCC.
引用
收藏
页码:1475 / 1484
页数:10
相关论文
共 50 条
  • [41] RELIABILITY ANALYSIS OF DRILLING OPERATION IN OPEN PIT MINES
    Rahimdel, M. J.
    Ataei, M.
    Kakaei, R.
    Hoseinie, S. H.
    ARCHIVES OF MINING SCIENCES, 2013, 58 (02) : 569 - 578
  • [42] Locating Equidistant Elevations in the Open Pit Mines.
    Noaghi, T.
    Padure, I.
    Mine, petrol si gaze, 1985, 36 (04): : 173 - 177
  • [43] COMBINED MINING SYSTEMS FOR OPEN PIT MINES.
    Franke, R.
    Bulk Solids Handling, 1982, 2 (01): : 75 - 80
  • [44] Dynamics of Fine Particle Emissions in Open Pit Mines
    V. M. Khazins
    V. V. Shuvalov
    S. P. Soloviev
    Izvestiya, Physics of the Solid Earth, 2021, 57 : 805 - 816
  • [45] Technology and Ecology of Dumping at Open Pit Mines in Kuzbass
    V. I. Cheskidov
    A. S. Bobyl’sky
    Journal of Mining Science, 2017, 53 : 882 - 889
  • [46] Double modification for mudstone roadbed of open pit mines
    Yang, Jian-Lin
    Wang, Lai-Gui
    Li, Xi-Lin
    Zhang, Peng
    Yantu Gongcheng Xuebao/Chinese Journal of Geotechnical Engineering, 2015, 37 (08): : 1469 - 1477
  • [47] OPEN-PIT DEWATERING AT PINE POINT MINES
    CALVER, B
    FARNSWOR.DJ
    CANADIAN MINING AND METALLURGICAL BULLETIN, 1969, 62 (692): : 1290 - &
  • [48] ANALYZING ENERGY COST IN OPEN PIT MINES.
    Kennedy Jr., W.J.
    Gardner, J.D.
    Mining Engineering, 1984, 36 (09) : 1331 - 1332
  • [49] CURRENT DRILLING AND BLASTING PRACTICES IN OPEN PIT MINES
    BAUER, A
    MINING CONGRESS JOURNAL, 1972, 58 (03): : 20 - &
  • [50] Deformation of high rock slopes in open pit mines
    Read, JRL
    EIGHTH INTERNATIONAL CONGRESS INTERNATIONAL ASSOCIATION FOR ENGINEERING GEOLOGY AND THE ENVIRONMENT, PROCEEDINGS, VOLS 1-5, 1998, : 2983 - 2994