共 50 条
- [31] Modification in Chen and Tsai’s method for solving time–cost trade-off problems of project networks in fuzzy environments Neural Computing and Applications, 2013, 23 : 1045 - 1050
- [33] Using machine learning and GA to solve time-cost trade-off problems Journal of Construction Engineering and Management, 125 (05): : 347 - 353
- [35] Using genetic algorithms to solve construction time-cost trade-off problems J Comput Civ Eng, 3 (184-189):
- [37] Trade-off between Impairment Awareness and Power Economy in Optical WDM Networks 2013 Workshop on Recent Advances in Photonics (WRAP), 2013,
- [39] A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction PLOS ONE, 2016, 11 (12):
- [40] Power bandwidth trade-off for sensory and ad-hoc wireless networks 2004 IEEE INTERNATIONAL SYMPOSIUM ON INFORMATION THEORY, PROCEEDINGS, 2004, : 470 - 470